Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction of 2/4 lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing Km 60.900 of old NH40) to NH106 (old NH 44E) (Package-III), from km 24+700 to km 38+256 under SARDP-NE PHA

  • Read more about Technical Evaluation Result for Construction of 2/4 lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing Km 60.900 of old NH40) to NH106 (old NH 44E) (Package-III), from km 24+700 to km 38+256 under SARDP-NE PHA

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pa

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pa

Technical Evaluation Result for Improvement and Widening of National Highway No. 127B (Darugiri – Songsak – Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to

  • Read more about Technical Evaluation Result for Improvement and Widening of National Highway No. 127B (Darugiri – Songsak – Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to

Technical Evaluation Result for Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder in the state of Meghalaya, from design Km 0+000 to Km 40+840 (Design Length= 40.840 Km) (existing Km 8+600 to Km

  • Read more about Technical Evaluation Result for Improvement/Widening of National Highway No. 217 (Dainadubi-Darugiri Section) to Two lane with paved shoulder in the state of Meghalaya, from design Km 0+000 to Km 40+840 (Design Length= 40.840 Km) (existing Km 8+600 to Km

Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B

  • Read more about Technical Evaluation Result for Four laning of Sethawn – N. Kawnpui section (Package-6) of NH-6 from Existing Chainage km 107+850 to km 126+315 (Design Chainage km 95+500 to km 111+850) on Silchar – Vairengte – Sairang road in the State of Mizoram under B

Technical Evaluation Result for Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar – Vairengte – Sairang road in the State of Assam un

  • Read more about Technical Evaluation Result for Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar – Vairengte – Sairang road in the State of Assam un

Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+975 Km) in the State of Nagaland on EPC mode under NH (O)-NE.. Dated : 15-03-2023.

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I (Design Chainage 0+000 Km to 34+975 Km) in the State of Nagaland on EPC mode under NH (O)-NE.. Dated : 15-03-2023.

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177+372 km (Design Ch.139+750 km to Ch.173+434 km) for Package-9 of Bilasipura- Guwahati road (NH 17) (Section: Dhupdhara Sahar to Milmila

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177+372 km (Design Ch.139+750 km to Ch.173+434 km) for Package-9 of Bilasipura- Guwahati road (NH 17) (Section: Dhupdhara Sahar to Milmila

Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode. Dated : 10-03-2023.

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul – Toloi – Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode. Dated : 10-03-2023.

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of 2-lane with paved shoulders of Aizawl Bypass from km 0.000 to km 10.600 (Package-1) and km 15.200 to km 34.500 (Package-3) on Sairang-Phaibawk

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 20
  • Page 21
  • Page 22
  • Page 23
  • Current page 24
  • Page 25
  • Page 26
  • Page 27
  • Page 28
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 195484