Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022.

  • Read more about Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022.

Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D

  • Read more about Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D

Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river

  • Read more about Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river

Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN

  • Read more about Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN

Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10-

  • Read more about Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10-

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A”

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A”

Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.

  • Read more about Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.

Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.

  • Read more about Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.

Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to C

  • Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to C

Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022.

  • Read more about Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 24
  • Page 25
  • Page 26
  • Page 27
  • Current page 28
  • Page 29
  • Page 30
  • Page 31
  • Page 32
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 196150