Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022. Read more about Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated : 18-11-2022.
Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D Read more about Technical Evaluation Result for “Restoration and Repair of NH-39 (new NH-29) from existing Dimapur- Kohima road (Km 156.000 to Km 172.900) [Length=16.90 Km] in the State of Nagaland in the FY 2022-23” – (Percentage Rate and Work Order Basis) – 2nd Call. D
Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river Read more about Technical Evaluation Result for Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river
Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN Read more about Technical Evaluation Result for CONSTRUCTION/ UPGRADATION OF EXISTING ROAD TO 2-LANE WITH PAVED SHOULDER INCLUDING GEOMETRIC IMPROVEMENT FROM RANIPOOL TO PAKYONG FROM KM 2.000 TO KM 16.167 (BALANCE WORK) OF NH-717-A ON EPC BASIS UNDER SARDP-NE PHASE-A IN
Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10- Read more about Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. (2nd Call). Dated : 19-10-
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A” Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Rehabilitation and Upgradation of Nongstoin-Rambrai-Kyrshai road up to Meghalaya-Assam Border from km 0.335 to km 34.039 to 2-Lane under SARDP-NE “Phase-A”
Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.
Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shantinagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23. Dated : 03-10-2022.
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to C Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) Construction of a 4 lane flyover with paved shoulder configuration for along with service road from 4 th Tawi bridge (D.Ch. 0.000) near Bhagwati chowk to C
Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022. Read more about Technical Evaluation Result for Re-Construction/Shifting of affected structures (Boundary Wall) premises to Assam Rifles under Fultali- Jurichhara section of NH-208 in the State of Tripura on percentage basis & work order basis. Dated : 19-09-2022.