Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-31 Read more about Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-31
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH 29 in the state of Assam on EPC m Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH 29 in the state of Assam on EPC m
Technical Evaluation Result for 2-laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 15-02-2023. Read more about Technical Evaluation Result for 2-laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 15-02-2023.
Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj ( Read more about Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo
Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023. Read more about Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023.
Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti Read more about Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti
Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023. Read more about Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023.
Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023.
Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023. Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.