Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-31

  • Read more about Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-31

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH 29 in the state of Assam on EPC m

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH 29 in the state of Assam on EPC m

Technical Evaluation Result for 2-laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 15-02-2023.

  • Read more about Technical Evaluation Result for 2-laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 15-02-2023.

Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (

  • Read more about Technical Evaluation Result for Consultancy Services for Carrying out Feasibility Studies (FS) and preparation of Feasibility Report in respect of “Up-gradation & Widening of road to two lane with paved shoulders from Hilli (West Bengal) to Mahendraganj (

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and pre- construction activities in respect of “Widening of existing carriageway into 2-lane with paved shoulder configuration and Several slope protection wo

Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023.

  • Read more about Technical Evaluation Result for and Widening to two lane with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) o. Dated : 06-02-2023.

Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti

  • Read more about Technical Evaluation Result for Construction of Uni-directional Singhpora – Vailoo Tunnel (Under Sinthanpass) of length 10.331km/10.363km (Tube-1/Tube-2)and its approach road from Km 111+067 (at Chhatroo km 140.870 on NH-244) to 149+678(at vailoo Juncti

Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023.

  • Read more about Technical Evaluation Result for empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 24-01-2023.

Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023.

  • Read more about Technical Evaluation Result for WIDENING TO 2 (TWO) LANE WITH HARD SHOULDER OF AKEGWO-AVANGKHU SECTION OF NH-202K FOR PACKAGE-I (DESIGN CHAINAGE 0+000 KM TO 34+975 KM) IN THE STATE OF NAGALAND ON EPC MODE UNDER NH (O)-NE. Dated : 17-01-2023.

Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.

  • Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II (Design Chainage 34+795 Km to 69+875 Km) in the State of Nagaland on EPC mode under NH (O)-NE. Dated : 17-01-2023.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 22
  • Page 23
  • Page 24
  • Page 25
  • Current page 26
  • Page 27
  • Page 28
  • Page 29
  • Page 30
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 27/09/2025

  • Total Visitors: 194838