Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S Read more about Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S
Technical Evaluation Result for Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the St Read more about Technical Evaluation Result for Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the St
Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 0.000 to km 10.600 (Package-1) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 07-03-2023. Read more about Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 0.000 to km 10.600 (Package-1) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 07-03-2023.
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated : 06-03 Read more about Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated : 06-03
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF “Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.”. Dated : 03-03-2023. Read more about Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF “Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.”. Dated : 03-03-2023.
Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 (Package-3) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 03-03-2023. Read more about Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 (Package-3) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 03-03-2023.
Technical Evaluation Result for Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (Existing km 60.900 of old NH-40) to NH106 (old NH-44E), km 0+000 to km 12+800 (Package-I) under SARDP-NE ‘PHASE A’ i Read more about Technical Evaluation Result for Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (Existing km 60.900 of old NH-40) to NH106 (old NH-44E), km 0+000 to km 12+800 (Package-I) under SARDP-NE ‘PHASE A’ i
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Four laning of Jhanji to Demow section of NH-37 from km 491.050 to km 535.250 (Design Chainage) from Km 490.800 to Km 534.800 in the state in the State of Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Four laning of Jhanji to Demow section of NH-37 from km 491.050 to km 535.250 (Design Chainage) from Km 490.800 to Km 534.800 in the state in the State of
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930 km to Ch.143+680 km (Design Ch.96+000 km to Ch. 139+750 km) for Package-8 of Bilasipura- Guwahati road (NH 17) (Section: Paikan to Dhupdhara Sahar) i Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930 km to Ch.143+680 km (Design Ch.96+000 km to Ch. 139+750 km) for Package-8 of Bilasipura- Guwahati road (NH 17) (Section: Paikan to Dhupdhara Sahar) i
Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 24-02-2023. Read more about Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 24-02-2023.