Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka
Technical Evaluation Result for PERIODIC RENEWALS OF NH-4 FROM KM 59.400 TO KM 107.000 (JARAWA-I) IN THE UNION TERRITORY OF ANDAMAN AND NICOBAR ISLAND ON ITEM RATE BASIS IN THE FY 2023-24. Dated : 30-05-2023. Read more about Technical Evaluation Result for PERIODIC RENEWALS OF NH-4 FROM KM 59.400 TO KM 107.000 (JARAWA-I) IN THE UNION TERRITORY OF ANDAMAN AND NICOBAR ISLAND ON ITEM RATE BASIS IN THE FY 2023-24. Dated : 30-05-2023.
Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si Read more about Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si
Technical Evaluation Result for Appointment of a Creative Agency for providing a creative/communication strategy and creative designs etc to the Ministry of Road Transport & Highways and its allied agencies. Dated : 18-05-2023. Read more about Technical Evaluation Result for Appointment of a Creative Agency for providing a creative/communication strategy and creative designs etc to the Ministry of Road Transport & Highways and its allied agencies. Dated : 18-05-2023.
Technical Evaluation Result for Empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 11-05-2023. Read more about Technical Evaluation Result for Empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 11-05-2023.
Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S Read more about Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NHconfiguration for Baramulla-Gulmarg Road (approx length 42 Km)” Read more about Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NHconfiguration for Baramulla-Gulmarg Road (approx length 42 Km)”
Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05 Read more about Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023. Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023.
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG