Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o Read more about Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o
Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu Read more about Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu
Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km) Read more about Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km)
Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng Read more about Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of N Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of N
Technical Evaluation Result for Balance work for Construction of 2 Laning with Hard Shoulder of Merangkong- Tamlu-Mon Road on EPC basis from existing Km 20.456 to Km 41.065 (Design Km. 20.000 to 40.000) (Design Length-20.000 Km) in the state of Nagaland Read more about Technical Evaluation Result for Balance work for Construction of 2 Laning with Hard Shoulder of Merangkong- Tamlu-Mon Road on EPC basis from existing Km 20.456 to Km 41.065 (Design Km. 20.000 to 40.000) (Design Length-20.000 Km) in the state of Nagaland
Technical Evaluation Result for Balance Work of Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road on EPC basis from existing Km 76+640 to Km 98+065 [Design Km.63+800 to Km.86+835] (Design Length–23.035 Km) (Package IV) in the state Read more about Technical Evaluation Result for Balance Work of Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road on EPC basis from existing Km 76+640 to Km 98+065 [Design Km.63+800 to Km.86+835] (Design Length–23.035 Km) (Package IV) in the state
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka
Technical Evaluation Result for PERIODIC RENEWALS OF NH-4 FROM KM 59.400 TO KM 107.000 (JARAWA-I) IN THE UNION TERRITORY OF ANDAMAN AND NICOBAR ISLAND ON ITEM RATE BASIS IN THE FY 2023-24. Dated : 30-05-2023. Read more about Technical Evaluation Result for PERIODIC RENEWALS OF NH-4 FROM KM 59.400 TO KM 107.000 (JARAWA-I) IN THE UNION TERRITORY OF ANDAMAN AND NICOBAR ISLAND ON ITEM RATE BASIS IN THE FY 2023-24. Dated : 30-05-2023.
Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si Read more about Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si