Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for the work Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect of the following : (i) Up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and f

  • Read more about Technical Evaluation Result for the work Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services in respect of the following : (i) Up-gradation to 2/4/6 lane from km 343 (Kumarghat) to km 397 (Ambassa) and f

Technical Evaluation Result for the work of Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930

  • Read more about Technical Evaluation Result for the work of Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930

Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services from –(i) Silchar ISBT (Start point of Silchar Bypass) to junction of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed

  • Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing pre-Construction services from –(i) Silchar ISBT (Start point of Silchar Bypass) to junction of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed

Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o

  • Read more about Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o

Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu

  • Read more about Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu

Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km)

  • Read more about Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km)

Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng

  • Read more about Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng

Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of N

  • Read more about Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of N

Technical Evaluation Result for Balance work for Construction of 2 Laning with Hard Shoulder of Merangkong- Tamlu-Mon Road on EPC basis from existing Km 20.456 to Km 41.065 (Design Km. 20.000 to 40.000) (Design Length-20.000 Km) in the state of Nagaland

  • Read more about Technical Evaluation Result for Balance work for Construction of 2 Laning with Hard Shoulder of Merangkong- Tamlu-Mon Road on EPC basis from existing Km 20.456 to Km 41.065 (Design Km. 20.000 to 40.000) (Design Length-20.000 Km) in the state of Nagaland

Technical Evaluation Result for Balance Work of Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road on EPC basis from existing Km 76+640 to Km 98+065 [Design Km.63+800 to Km.86+835] (Design Length–23.035 Km) (Package IV) in the state

  • Read more about Technical Evaluation Result for Balance Work of Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road on EPC basis from existing Km 76+640 to Km 98+065 [Design Km.63+800 to Km.86+835] (Design Length–23.035 Km) (Package IV) in the state

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 16
  • Page 17
  • Page 18
  • Page 19
  • Current page 20
  • Page 21
  • Page 22
  • Page 23
  • Page 24
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 28/09/2025