Technical Evaluation Result for the project of Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Read more about Technical Evaluation Result for the project of Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design
New Technical Evaluation Result for the project of Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on E Read more about New Technical Evaluation Result for the project of Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on E
Technical Evaluation Result for the project of Appointment of Creative Agency By The National Highways & Infrastructure Development Corporation Ltd. (NHIDCL). Dated: 06-03-2020. Read more about Technical Evaluation Result for the project of Appointment of Creative Agency By The National Highways & Infrastructure Development Corporation Ltd. (NHIDCL). Dated: 06-03-2020.
Financial opening letter for the project of Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode. Da Read more about Financial opening letter for the project of Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode. Da
Evaluation Result for Routine maintenance of KohimaJessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis. Dated: 26-02-2020. Read more about Evaluation Result for Routine maintenance of KohimaJessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis. Dated: 26-02-2020.
Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km. 18+779 to Km. 33+428] (Design Length –14+649 Km) in the state of Nagaland (Pkg-2) under NH Read more about Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km. 18+779 to Km. 33+428] (Design Length –14+649 Km) in the state of Nagaland (Pkg-2) under NH
Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+779] (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1)” under NH (O) Read more about Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+779] (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1)” under NH (O)
Financial Bid Opening for Special Protection Work on Rehabilitation and restoration of Sinking/Sliding Zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of Narrow Zone from Km 53+775 to Km 54+100 Read more about Financial Bid Opening for Special Protection Work on Rehabilitation and restoration of Sinking/Sliding Zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of Narrow Zone from Km 53+775 to Km 54+100
Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020. Read more about Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020.
Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020 Read more about Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020