Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Financial opening letter for the project of Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode. Da

  • Read more about Financial opening letter for the project of Improvement and Widening to two lanes with paved shoulders of Jolaibari – Belonia (from km 0.000 to km 21.412) section of NH-108A in the state of Tripura on Engineering, Procurement & Construction (EPC) mode. Da

Evaluation Result for Routine maintenance of KohimaJessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis. Dated: 26-02-2020.

  • Read more about Evaluation Result for Routine maintenance of KohimaJessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis. Dated: 26-02-2020.

Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km. 18+779 to Km. 33+428] (Design Length –14+649 Km) in the state of Nagaland (Pkg-2) under NH

  • Read more about Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya – Longleng Road on EPC basis from existing Km 16.530 to Km 29.530 [Design Km. 18+779 to Km. 33+428] (Design Length –14+649 Km) in the state of Nagaland (Pkg-2) under NH

Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+779] (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1)” under NH (O)

  • Read more about Financial Bid Opening for Construction of two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+779] (Design Length – 18.779 Km) in the state of Nagaland (Pkg-1)” under NH (O)

Financial Bid Opening for Special Protection Work on Rehabilitation and restoration of Sinking/Sliding Zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of Narrow Zone from Km 53+775 to Km 54+100

  • Read more about Financial Bid Opening for Special Protection Work on Rehabilitation and restoration of Sinking/Sliding Zone from Km 70+900 to Km 71+100 and Km 71+550 to Km 71+850 with JICA Technical Assistance including widening of Narrow Zone from Km 53+775 to Km 54+100

Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020.

  • Read more about Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020.

Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020

  • Read more about Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020

Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Multilevel Car Parking System at various locations in India (2nd Phase). Dated: 17-02-2020.

  • Read more about Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Multilevel Car Parking System at various locations in India (2nd Phase). Dated: 17-02-2020.

Technical evaluation result for Construction of Bi-directional Tunnel at “Km 83” of Length 495 m including approaches road of 664 m and a Major Bridge of 110 m from Km 82+675 to Km 82+925 on NH-244 in Jammu & Kashmir on EPC mode. Dated: 05-02-2020.

  • Read more about Technical evaluation result for Construction of Bi-directional Tunnel at “Km 83” of Length 495 m including approaches road of 664 m and a Major Bridge of 110 m from Km 82+675 to Km 82+925 on NH-244 in Jammu & Kashmir on EPC mode. Dated: 05-02-2020.

Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 03-02-2020.

  • Read more about Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 03-02-2020.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 74
  • Page 75
  • Page 76
  • Page 77
  • Current page 78
  • Page 79
  • Page 80
  • Page 81
  • Page 82
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 10/09/2025

  • Total Visitors: 139930