Technical Evaluation Result for Routine maintenance of Kohima-Jessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis and Work Order Basis- Retender.Dated: 09-04-2020. Read more about Technical Evaluation Result for Routine maintenance of Kohima-Jessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis and Work Order Basis- Retender.Dated: 09-04-2020.
Technical Evaluation Result for Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EP Read more about Technical Evaluation Result for Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EP
Technical Evaluation Result for Maintenance of NHIDCL Website & Handling of Social Media accounts of NHIDCL.Dated: 23-03-2020. Read more about Technical Evaluation Result for Maintenance of NHIDCL Website & Handling of Social Media accounts of NHIDCL.Dated: 23-03-2020.
Technical Evaluation Result for RFP for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020. Read more about Technical Evaluation Result for RFP for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.
Technical Evaluation Result for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020. Read more about Technical Evaluation Result for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.
Technical Evaluation Result for Short Term Improvement of the Road from Km 0.00 (Sirwani Road) to Km 3.00 (Dalep Turning) of NH-510 in the State of Sikkim on Item Rate Basis. Dated: 21-03-2020. Read more about Technical Evaluation Result for Short Term Improvement of the Road from Km 0.00 (Sirwani Road) to Km 3.00 (Dalep Turning) of NH-510 in the State of Sikkim on Item Rate Basis. Dated: 21-03-2020.
Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari Phatak) in the state of Sikkim on Item Rate Basis. Dated: 21-03-2020. Read more about Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari Phatak) in the state of Sikkim on Item Rate Basis. Dated: 21-03-2020.
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state o Read more about Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state o
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200 Read more about Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length: 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.Dated: 20-03- Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length: 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.Dated: 20-03-