Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated: 27-08-2020. Read more about Technical Evaluation Result for Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. Dated: 27-08-2020.
Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on Read more about Technical Evaluation Result for Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on
Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel Read more about Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel
Technical Evaluation Result for Construction of two-lane with hard shoulders of Arrow-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 26-08-2020. Read more about Technical Evaluation Result for Construction of two-lane with hard shoulders of Arrow-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 26-08-2020.
Technical Evaluation Result for Strengthening & Upgradation of existing carriageway to the intermediate lane from Km 0.000 to Km 42.820 of length 42.820Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Date Read more about Technical Evaluation Result for Strengthening & Upgradation of existing carriageway to the intermediate lane from Km 0.000 to Km 42.820 of length 42.820Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Date
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800km to Ch.84.100km) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of B Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800km to Ch.84.100km) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of B
Technical Evaluation Result for widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram with JICA loan assistance. Dated: 20-08 Read more about Technical Evaluation Result for widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram with JICA loan assistance. Dated: 20-08
Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and La Read more about Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and La
Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package Read more about Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package
Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] Read more about Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km]