Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha

Sub Title
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Phase’A’ on EPC mode in the state of Sikkim (Package-VI) – reg. Dated: 08-09-2020.
Upload file
Year
Tender Date