Short Term Maintenance Contract for Maintenance and Repair of 4-laning of Dimapur- Kohima section on NH-29 from Km 123.840 to Km 138.775 in the state of Nagaland in FY 2025-26 Percentage Rate and work Order Basis Read more about Short Term Maintenance Contract for Maintenance and Repair of 4-laning of Dimapur- Kohima section on NH-29 from Km 123.840 to Km 138.775 in the state of Nagaland in FY 2025-26 Percentage Rate and work Order Basis
Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km) Read more about Strengthening of Churachandpur to Imphal section of old NH-150 (new NH-02) from Churachandpur Police Station (km 402+000) to Malom Oil Depot Gate (km 454+798) in the State of Manipur on EPC mode under NH(O)-NE (Length-53.400 km)
Consultancy Services of Authority's Engineer for Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode i Read more about Consultancy Services of Authority's Engineer for Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode i
Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam, development of its junction and identification & realignment from Km 0+000 to Km 3+074 (S Read more about Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam, development of its junction and identification & realignment from Km 0+000 to Km 3+074 (S
Consultancy services for preparation of Detailed ProjectReport and Pre-construction activities in respect ofconstruction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / Read more about Consultancy services for preparation of Detailed ProjectReport and Pre-construction activities in respect ofconstruction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking /
Consultancy Services for Authority's Engineer for supervision of (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara Read more about Consultancy Services for Authority's Engineer for supervision of (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118+850 to km 132+037 (Package-4A) in the State of Manipur on EPC Mode
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode
Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya. Read more about Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya.
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode Read more about Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package-4B) in the State of Manipur on EPC Mode