Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction of two-lane with hard shoulders of Arrow-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 26-08-2020.

  • Read more about Technical Evaluation Result for Construction of two-lane with hard shoulders of Arrow-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE. Dated: 26-08-2020.

Technical Evaluation Result for Strengthening & Upgradation of existing carriageway to the intermediate lane from Km 0.000 to Km 42.820 of length 42.820Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Date

  • Read more about Technical Evaluation Result for Strengthening & Upgradation of existing carriageway to the intermediate lane from Km 0.000 to Km 42.820 of length 42.820Kms on Baramulla-Gulmarg section of NH-701A in the Union Territory of Jammu & Kashmir on EPC mode. Date

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800km to Ch.84.100km) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of B

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 75.330km to Ch.88.000 km (Design Ch.71.800km to Ch.84.100km) of Jogighopa Bridge Approach (Near Pancharatna) – Agia (Near Nichinta) Section (Package-6) of B

Technical Evaluation Result for widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram with JICA loan assistance. Dated: 20-08

  • Read more about Technical Evaluation Result for widening and upgradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram with JICA loan assistance. Dated: 20-08

Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and La

  • Read more about Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and La

Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package

  • Read more about Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package

Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km]

  • Read more about Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km]

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna

Technical Evaluation Result for Additional Work for Construction of Landslide Protection Gallery, Slope Protection works including Cattle Fence, Restoration of Irrigation Channel and River Protection Work at Bareti, Uttarkashi from Km 100.300 to km 101.06

  • Read more about Technical Evaluation Result for Additional Work for Construction of Landslide Protection Gallery, Slope Protection works including Cattle Fence, Restoration of Irrigation Channel and River Protection Work at Bareti, Uttarkashi from Km 100.300 to km 101.06

Technical Evaluation Result for Restoration of road by construction of Protection Walls, Cross Drainage Works & Fixtures of Road Safety Furniture from Km 0.000 to Km 170.000 (NH244) on Batote-KishtwarSinthanpass road in UT of Jammu & Kashmir.Dated: 23-07-

  • Read more about Technical Evaluation Result for Restoration of road by construction of Protection Walls, Cross Drainage Works & Fixtures of Road Safety Furniture from Km 0.000 to Km 170.000 (NH244) on Batote-KishtwarSinthanpass road in UT of Jammu & Kashmir.Dated: 23-07-

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 67
  • Page 68
  • Page 69
  • Page 70
  • Current page 71
  • Page 72
  • Page 73
  • Page 74
  • Page 75
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 11/09/2025

  • Total Visitors: 140109