Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 05-10-2020. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 05-10-2020.
Technical Evaluation Result for Earthwork in Formation, Road Work, Construction of Bridges, Blanketing,P. Way Linking works including Supply of P. Way Fittings and Track Ballast inconnection with Construction of Railway Siding from jogighopa Railway Stati Read more about Technical Evaluation Result for Earthwork in Formation, Road Work, Construction of Bridges, Blanketing,P. Way Linking works including Supply of P. Way Fittings and Track Ballast inconnection with Construction of Railway Siding from jogighopa Railway Stati
Technical Evaluation Result for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – starting near K Read more about Technical Evaluation Result for Authority’s Engineer for Improvement and Widening to two lane with paved shoulder of Kailashahar – Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode – starting near K
Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design le Read more about Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Rongara to Panda, existing chainage from km 102+345 to km 119.810 (design Chainage from km 96+000 to km 112.300) design le
Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design leng Read more about Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design leng
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050
Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode. Read more about Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode.
Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020. Read more about Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020.
Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel Read more about Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel
Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020. Read more about Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020.