Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design leng

  • Read more about Technical Evaluation Result for Improvement/Widening to 2 Lane with Earthen Shoulder of RanikorMaheshkola-Baghmara road section from Kanai – Rongara, existing chainage from km 85+970 to km 102+345 (design Chainage from km 81+100 to km 96+000) design leng

Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050

  • Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050

Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode.

  • Read more about Technical Evaluation Result for Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under Bharatmala NH(O) – TSP in the state of Nagaland in EPC mode.

Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020.

  • Read more about Technical Evaluation Result for Part Design, Construction, Operation & Maintenance (For a period of 5 years) of Fully Automatic Multi-level Parking System at Central Civil Secretariat, Itanagar, Arunachal Pradesh. Dated: 28-09-2020.

Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel

  • Read more about Technical Evaluation Result for Consultancy services for (i) preparation of DPR for Development of Self-Sustainable Bus Port at Udaipur (Tripura), Baddi (Himachal Pradesh) and Port Blair (Andaman and Nicobar Islands) (ii) Supervision of Development of Sel

Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020.

  • Read more about Technical Evaluation Result for work of Construction of two-lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)- NE. Dated: 25-09-2020.

Technical Evaluation Result for Restoration and Repair of RCC Bridge at Imphal-Jiribam Road of NH-37 at Ch: 132.465 (Old Ch: 137.00) in the state of Manipur in the FY 2020-21. Dated: 24-09-2020.

  • Read more about Technical Evaluation Result for Restoration and Repair of RCC Bridge at Imphal-Jiribam Road of NH-37 at Ch: 132.465 (Old Ch: 137.00) in the state of Manipur in the FY 2020-21. Dated: 24-09-2020.

Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.

  • Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.

Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km]

  • Read more about Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length – 10.500 Km]

Technical Evaluation Result for Empanelment of consultants for Waste Management consisting of collection, handling, storage and transportation of Municipal Solid Waste to the designated waste processing site. Dated: 22-09-2020.

  • Read more about Technical Evaluation Result for Empanelment of consultants for Waste Management consisting of collection, handling, storage and transportation of Municipal Solid Waste to the designated waste processing site. Dated: 22-09-2020.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 64
  • Page 65
  • Page 66
  • Page 67
  • Current page 68
  • Page 69
  • Page 70
  • Page 71
  • Page 72
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 11/09/2025

  • Total Visitors: 140612