Technical Evaluation Result for Construction of 2-lane specification road with paved shoulder including tunnel (300m) at Ranbangla on NH-510 (Singrtam-Tarku-Rabongal-Legaship-Gyalshing) Package-III (Design Chainage from Km 32.500 to Km 33.600) under SARD Read more about Technical Evaluation Result for Construction of 2-lane specification road with paved shoulder including tunnel (300m) at Ranbangla on NH-510 (Singrtam-Tarku-Rabongal-Legaship-Gyalshing) Package-III (Design Chainage from Km 32.500 to Km 33.600) under SARD
Technical Evaluation Result Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474 Read more about Technical Evaluation Result Consultancy services for Authority’s Engineer for Supervision of (i) Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 7.880 (near Chedama Junction) to existing km 30.474
Final Shortlisted Result Improvement into two-lane with paved shoulder/four-lane of NH-40 between Shillong to Dawki section including the construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch. 71.520 of NH-40 & Ch. 0.000 to Ch. 0.900 Read more about Final Shortlisted Result Improvement into two-lane with paved shoulder/four-lane of NH-40 between Shillong to Dawki section including the construction of Dawki bridge Design length = 63.91 Km (Ch. 0.000 To Ch. 71.520 of NH-40 & Ch. 0.000 to Ch. 0.900
Technical Evaluation Result for Rehabilitation and Up-gradation of road from design km 31.300 to km 45.300 (Total length : 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (package II Read more about Technical Evaluation Result for Rehabilitation and Up-gradation of road from design km 31.300 to km 45.300 (Total length : 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (package II
Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020. Read more about Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020.
Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units( Read more about Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units(
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha
Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainam Read more about Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainam
Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020 Read more about Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020