Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assist Read more about Technical Evaluation Result for Construction of Lawngtlai bypass (Package-3) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japan International Cooperation Agency (JICA) loan assist
Technical Evaluation Result for Improvement to 2 Lane with paved shoulder of NH-40 section from Km 131+820 to Km 151+330 (design Km 45+760 to Km 63+530) design length 17.77 km in the State of Meghalaya on EPC Mode under JICA loan Assistance(Package-IV). D Read more about Technical Evaluation Result for Improvement to 2 Lane with paved shoulder of NH-40 section from Km 131+820 to Km 151+330 (design Km 45+760 to Km 63+530) design length 17.77 km in the State of Meghalaya on EPC Mode under JICA loan Assistance(Package-IV). D
Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total length 11.600 Km in Read more about Technical Evaluation Result for Improvement to 2 lane with paved shoulder of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total length 11.600 Km in
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated: Read more about Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Civil Engineers at NHIDCL Headquarters, New Delhi, its Site Offices, Project Monitoring Units (PMUs) and Regional Offices (ROs) of NHIDCL across India. Dated:
Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Chochenpheri at km. 52+000 to Helipad near Menla at km. 82+000 of Rhenok – Menla spur (NH-717B) Package-IIIA on EPC Basis under SARDP-NE Phase ‘A Read more about Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Chochenpheri at km. 52+000 to Helipad near Menla at km. 82+000 of Rhenok – Menla spur (NH-717B) Package-IIIA on EPC Basis under SARDP-NE Phase ‘A
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 37+600 (New Rolep Bridge) to km. 52+000 (Chochenpheri) of Rhenok – Menla spur (NH-717B) Package-II C on EPC Basis under SARDP-NE Phase ‘A’ Read more about Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 37+600 (New Rolep Bridge) to km. 52+000 (Chochenpheri) of Rhenok – Menla spur (NH-717B) Package-II C on EPC Basis under SARDP-NE Phase ‘A’
Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 20-10-2020. Read more about Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim & Uttarakhand in high altitude remote areas. Dated: 20-10-2020.
Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 20-10-2020. Read more about Technical Evaluation Result for Construction and Installation of prefabricated Office cum Residence in the States of Himachal Pradesh & Union Territory of Ladakh in high altitude remote areas. Dated: 20-10-2020.
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on
Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21. Dated: 19-10-2020. Read more about Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21. Dated: 19-10-2020.