Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM MIPI TO MATHUN (BASAM) FROM KM 0.000 TO KM 16.730 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-12-2020. Read more about Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM MIPI TO MATHUN (BASAM) FROM KM 0.000 TO KM 16.730 IN ANINI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-12-2020.
Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for RO-Guwahati, NHIDCL in the state of Assam. Dated: 08-12-2020. Read more about Technical Evaluation Result for Hiring of Vehicles on Monthly Basis for RO-Guwahati, NHIDCL in the state of Assam. Dated: 08-12-2020.
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Un-skilled, semi-skilled and skilled manpower on monthly basis for NHIDCL in the State of Assam. Dated: 08-12-2020. Read more about Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Un-skilled, semi-skilled and skilled manpower on monthly basis for NHIDCL in the State of Assam. Dated: 08-12-2020.
Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TEDADEGE TO HENKAER FROM KM 0.000 TO KM 28.550 IN WEST SIANG DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 08-12-2020. Read more about Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TEDADEGE TO HENKAER FROM KM 0.000 TO KM 28.550 IN WEST SIANG DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 08-12-2020.
Technical Evaluation Result for INSTRUCTIONS TO TENDERERS and FORM OF TENDER for PART DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE (For a Period of 5 Years) OF FULLY AUTOMATIC MULTI-LEVEL CAR PARKING SYSTEM AT CENTRAL CIVIL SECRETARIAT, ITANAGAR, ARUNACH Read more about Technical Evaluation Result for INSTRUCTIONS TO TENDERERS and FORM OF TENDER for PART DESIGN, CONSTRUCTION, OPERATION & MAINTENANCE (For a Period of 5 Years) OF FULLY AUTOMATIC MULTI-LEVEL CAR PARKING SYSTEM AT CENTRAL CIVIL SECRETARIAT, ITANAGAR, ARUNACH
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050 Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing km 0.00 to km 14.050
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Construction and Upgradation of existing road to 2- lane with paved shoulder configuration of Rhenok – Menla spur (NH-717B) on EPC Mode under SARDP-NE Phase Read more about Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of “Construction and Upgradation of existing road to 2- lane with paved shoulder configuration of Rhenok – Menla spur (NH-717B) on EPC Mode under SARDP-NE Phase
Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21- 2nd Call. Dated: 26-11-2020. Read more about Technical Evaluation Result for Special repair of NH 702-D, Mokokchung-Mariani Road (from Km 0.000 to 63.000 Km) [Total length – 63.00 Km] in the state of Nagaland for the FY 2020-21- 2nd Call. Dated: 26-11-2020.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Jammu and Kashmir. Dated: 25-11-2020. Read more about Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Jammu and Kashmir. Dated: 25-11-2020.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Meghalaya. Dated: 24-11-2020. Read more about Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the State of Meghalaya. Dated: 24-11-2020.