Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 95.00 To Km 111.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd call. Dated: 02-01-2021.

  • Read more about Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 95.00 To Km 111.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd call. Dated: 02-01-2021.

Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 79.00 To Km 95.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd Call. Dated: 02-01-2021.

  • Read more about Technical Evaluation Result for Restoration/ Rehabilitation Of Ukhrul To Nagaland Border Via Jessami Road From Km 79.00 To Km 95.00 (Length 16 Km) NH-150 In The State Of Manipur-2nd Call. Dated: 02-01-2021.

TECHNICAL EVALUATION RESULT FOR CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION

  • Read more about TECHNICAL EVALUATION RESULT FOR CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION

Technical Evaluation Result for Notice Inviting Expression of Interest (EOI) for Engagement of Agency for Aerial Data Collection and Monitoring of NHIDCL Works Using Drone Technology. Dated: 31-12-2020.

  • Read more about Technical Evaluation Result for Notice Inviting Expression of Interest (EOI) for Engagement of Agency for Aerial Data Collection and Monitoring of NHIDCL Works Using Drone Technology. Dated: 31-12-2020.

Technical Evaluation Result for 2nd call for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (

  • Read more about Technical Evaluation Result for 2nd call for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (

Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-4th Cal. Dated: 26-12-2020.

  • Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-4th Cal. Dated: 26-12-2020.

Technical Evaluation Result for Ordinary Repair of NH-08 from Km 422.000 to Km 423.000, Km 437.750 to Km 438.000, Km 438.340 to 443.000, Km 444.000 to Km 445.000 & Km 453.00 to Km 455.000 (Total Length = 8.91 Km) in the state of Tripura in the FY 2020-21

  • Read more about Technical Evaluation Result for Ordinary Repair of NH-08 from Km 422.000 to Km 423.000, Km 437.750 to Km 438.000, Km 438.340 to 443.000, Km 444.000 to Km 445.000 & Km 453.00 to Km 455.000 (Total Length = 8.91 Km) in the state of Tripura in the FY 2020-21

Technical Evaluation Result for Construction of High Altitude Hill road from Taksing to Ghora from KM 0.000 to KM 7.090 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode.Dated: 24-12-2020.

  • Read more about Technical Evaluation Result for Construction of High Altitude Hill road from Taksing to Ghora from KM 0.000 to KM 7.090 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode.Dated: 24-12-2020.

Technical Evaluation Result for Automated Multilevel Tower car parking facility at Aluva Metro station, Kochi, Kerala. Dated: 22-12-2020.

  • Read more about Technical Evaluation Result for Automated Multilevel Tower car parking facility at Aluva Metro station, Kochi, Kerala. Dated: 22-12-2020.

Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the St

  • Read more about Technical Evaluation Result for Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad at Menla at km 82.000 to Menla at Km 94.030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the St

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 56
  • Page 57
  • Page 58
  • Page 59
  • Current page 60
  • Page 61
  • Page 62
  • Page 63
  • Page 64
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 11/09/2025

  • Total Visitors: 139941