Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th Read more about Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th
Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th Read more about Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th
Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call. Dated: 19-02-2021. Read more about Technical Evaluation Result for Ordinary Repairs of NH-4 from Ch 21+000 km to Ch 28+000 km in the Union Territory of Andaman and Nicobar Islands in the year 2020-21-6th Call. Dated: 19-02-2021.
Technical Evaluation Result for Purchase of 15 KVA DG set with installation for Project Monitoring Unit- Rhenock in State of Sikkim on e-tendering mode. Dated: 16-02-2021. Read more about Technical Evaluation Result for Purchase of 15 KVA DG set with installation for Project Monitoring Unit- Rhenock in State of Sikkim on e-tendering mode. Dated: 16-02-2021.
Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Ladakh. Dated: 17-02-2021. Read more about Technical Evaluation Result for Detailed survey of various roads using Network Survey Vehicle (NSV) in the UT of Ladakh. Dated: 17-02-2021.
Technical Evaluation Result for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana. Dated: 15-02-2021. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Inception Report & Detailed Project Report (DPR) for Development of Multi Modal Logistics Park at Silchar in the State of Assam under Bharatmala Pariyojana. Dated: 15-02-2021.
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode. Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram- Peren section (Package-IIB , length- 18.160 Km) from Design Chainage 56.840 km to km 75.000 on NH-129A in the State of Manipur on EPC mode.
Technical Evaluation Result for Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. (Pkg-III). Dated: 0 Read more about Technical Evaluation Result for Construction of Uni-Directional Khellani Tunnel of length 1.574 Km & its approach Road from Km 29.030 to Km 31.449 of total length of 2.419 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC Mode. (Pkg-III). Dated: 0
Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da Read more about Technical Evaluation Result for Improvement of existing road to 2 laning with Hard Shoulders of 2 laning of Maram-Peren section (Package-IIA, length- 16.840 Km) from Design Chainage 40.000 km to 56.840 Km on NH-129A in the State of Manipur on EPC mode. Da
Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands-2 Call. Dated: 03-02-2021. Read more about Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands-2 Call. Dated: 03-02-2021.