Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 19-03-2021.

  • Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 19-03-2021.

Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Amarpur TSR Camp) to (Jatanbari) (Km. 194.400 to Km. 208.800) [Total Length 14.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 18-03-2021.

  • Read more about Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Amarpur TSR Camp) to (Jatanbari) (Km. 194.400 to Km. 208.800) [Total Length 14.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 18-03-2021.

Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-

  • Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-

Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section on NH-129A in the State of Manipur on EPC Mode for following pkgs.: (i)

  • Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section on NH-129A in the State of Manipur on EPC Mode for following pkgs.: (i)

Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. Dated: 17-03-2021.

  • Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. Dated: 17-03-2021.

Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC

  • Read more about Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC

Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH- 39 from Km 395.680 to Km 406.000 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-III) on Engineering, Procurement & Construction (E

  • Read more about Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH- 39 from Km 395.680 to Km 406.000 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-III) on Engineering, Procurement & Construction (E

Technical Evaluation Result for Appointment of Financial Consultancy Services for Agartala to Sabroom section of NH-08 from CH 6.8 Km to 128.712 Km including Feni Bridge at international border of India and Bangladesh in the state of Tripura undertaken by

  • Read more about Technical Evaluation Result for Appointment of Financial Consultancy Services for Agartala to Sabroom section of NH-08 from CH 6.8 Km to 128.712 Km including Feni Bridge at international border of India and Bangladesh in the state of Tripura undertaken by

Technical Evaluation Result for Shifting of 33KV, 11 KV and LT line on Jammu-Akhnoor section of NH-144 A in the UT of Jammu & Kashmir. Dated: 16-03-2021.

  • Read more about Technical Evaluation Result for Shifting of 33KV, 11 KV and LT line on Jammu-Akhnoor section of NH-144 A in the UT of Jammu & Kashmir. Dated: 16-03-2021.

Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu &

  • Read more about Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu &

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 51
  • Page 52
  • Page 53
  • Page 54
  • Current page 55
  • Page 56
  • Page 57
  • Page 58
  • Page 59
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 10/09/2025

  • Total Visitors: 139930