Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojan Read more about Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala Pariyojan
Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bhara Read more about Technical Evaluation Result for construction of 2-laning with hard shoulder configuration of Lunglei to Chhumkhum from Design Chainage Km 0.000 (Hrangchalkawn) to Km 37.420 [Pkg-A] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bhara
Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021 Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode. Dated: 25-03-2021
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct
Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct Read more about Technical Evaluation Result for Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length=17.180 Km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construct
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-202 Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-202
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-20 Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-20
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated:
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-0 Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-0