Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-202 Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section (Package 2) of NH 29 in the state of Assam on EPC mode. Dated: 24-03-202
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-20 Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-20
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated:
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-0 Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-0
Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03 Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03
Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in Read more about Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in
Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. D Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. D
Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pari Read more about Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pari
Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connec Read more about Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connec
Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021. Read more about Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021.