Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Pr Read more about Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Pr
Technical Evaluation Result for Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). Dated: 23-03-2021. Read more about Technical Evaluation Result for Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). Dated: 23-03-2021.
Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Khowai) to (Kalyanpur) (Km. 108.600 to Km. 124.000) [Total Length 15.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 22-03-2021. Read more about Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Khowai) to (Kalyanpur) (Km. 108.600 to Km. 124.000) [Total Length 15.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 22-03-2021.
Technical Evaluation Result for Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 19-03-2021. Read more about Technical Evaluation Result for Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 19-03-2021.
Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 19-03-2021. Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length10. 65km) (PKG-4) on EPC mode. Dated: 19-03-2021.
Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Amarpur TSR Camp) to (Jatanbari) (Km. 194.400 to Km. 208.800) [Total Length 14.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 18-03-2021. Read more about Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Amarpur TSR Camp) to (Jatanbari) (Km. 194.400 to Km. 208.800) [Total Length 14.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 18-03-2021.
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH- Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 52.470 km to Ch.71.500 km (Design Ch.48.655 km to Ch.67.556 km) of Tulungia- Jogighopa Bridge Approach Section (Package-5) of Bilasipura- Guwahati road (NH-
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section on NH-129A in the State of Manipur on EPC Mode for following pkgs.: (i) Read more about Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF “Improvement of existing road to 2 laning with Hard Shoulders of Maram- Peren section on NH-129A in the State of Manipur on EPC Mode for following pkgs.: (i)
Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. Dated: 17-03-2021. Read more about Technical Evaluation Result for Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length-10.00km) (PKG-1) on EPC mode. Dated: 17-03-2021.
Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC Read more about Technical Evaluation Result for Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-IV) on Engineering, Procurement & Construction (EPC