Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03

  • Read more about Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03

Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in

  • Read more about Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in

Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. D

  • Read more about Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. D

Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pari

  • Read more about Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pari

Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connec

  • Read more about Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connec

Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021.

  • Read more about Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021.

Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Pr

  • Read more about Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Pr

Technical Evaluation Result for Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). Dated: 23-03-2021.

  • Read more about Technical Evaluation Result for Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 of Ranikhor- Baghmara Project in the state of Meghalaya under “SARDP-NE” Phase-A on EPC mode (Package-III). Dated: 23-03-2021.

Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Khowai) to (Kalyanpur) (Km. 108.600 to Km. 124.000) [Total Length 15.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 22-03-2021.

  • Read more about Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Khowai) to (Kalyanpur) (Km. 108.600 to Km. 124.000) [Total Length 15.400 Km.] in the State of Tripura in the FY 2021-22. Dated: 22-03-2021.

Technical Evaluation Result for Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 19-03-2021.

  • Read more about Technical Evaluation Result for Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 19-03-2021.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 50
  • Page 51
  • Page 52
  • Page 53
  • Current page 54
  • Page 55
  • Page 56
  • Page 57
  • Page 58
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 10/09/2025

  • Total Visitors: 139914