Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20- Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length: 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-0 Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length: 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-0
Technical Evaluation Result for Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 1. Dated: 18-03-2020. Read more about Technical Evaluation Result for Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 1. Dated: 18-03-2020.
Technical Evaluation Result for Widening / Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode under NH(O). Dated: 1 Read more about Technical Evaluation Result for Widening / Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode under NH(O). Dated: 1
Technical Evaluation Result for Four Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 2. Dated: 17-03-2020. Read more about Technical Evaluation Result for Four Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 2. Dated: 17-03-2020.
Financial Bid Opening for Construction of two-lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [De Read more about Financial Bid Opening for Construction of two-lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) From existing km 30.474 (near Kidwema road Chakahabama) to existing km 53.220 (near Kikruma Village) [ Design Km 29.6 to design Km 51.5] [De
Technical Evaluation Result for Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode. Dated: 16-03-2020. Read more about Technical Evaluation Result for Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode. Dated: 16-03-2020.
Technical Evaluation Result for the project of Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design Read more about Technical Evaluation Result for the project of Construction of two lane with hard shoulder of Kohima-jessami Road on NH-29 (Old NH-150) from existing km 53.220 (near Kikruma Village) to existing km 76.320 (near Mesulumi Village) [ Design Km 51.5 to design
New Technical Evaluation Result for the project of Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on E Read more about New Technical Evaluation Result for the project of Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.36 km) on E
Technical Evaluation Result for the project of Appointment of Creative Agency By The National Highways & Infrastructure Development Corporation Ltd. (NHIDCL). Dated: 06-03-2020. Read more about Technical Evaluation Result for the project of Appointment of Creative Agency By The National Highways & Infrastructure Development Corporation Ltd. (NHIDCL). Dated: 06-03-2020.