Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Te Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Te
Technical Evaluation Result for Development of External Trunk Connectivity and Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode” (Package-I: Road and Utili Read more about Technical Evaluation Result for Development of External Trunk Connectivity and Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode” (Package-I: Road and Utili
Technical Evaluation Result for Development of Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode (Package-II). Dated: 03-06-2020. Read more about Technical Evaluation Result for Development of Internal Infrastructure Works at Multi-Model Logistics Park at Jogighopa in the state of Assam on Engineering, Procurement & Construction (EPC) Mode (Package-II). Dated: 03-06-2020.
Technical Evaluation Result Consultancy services as Authority’s Engineer for Supervision of “Rehabilitation and Up-gradation to 2 lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 0+000 to Km 69+015 (D Read more about Technical Evaluation Result Consultancy services as Authority’s Engineer for Supervision of “Rehabilitation and Up-gradation to 2 lane with paved shoulders of Seling-Dulte section (Economic Corridor) of NH-6 from Existing chainage Km 0+000 to Km 69+015 (D
Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territ Read more about Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Highway Tunnel including approaches across Shinkun La, Tanglang La & Lachalung La in the Union Territ
Technical Evaluation Result of the tender “M&R works for Akhegwo to Jessami (Aakash Bridge) of NH-202 from Km.283+000 to Km. 326+000, L=43 Km in the State of Nagaland on Item Rate and Work Order Basis. Dated: 21-05-2020. Read more about Technical Evaluation Result of the tender “M&R works for Akhegwo to Jessami (Aakash Bridge) of NH-202 from Km.283+000 to Km. 326+000, L=43 Km in the State of Nagaland on Item Rate and Work Order Basis. Dated: 21-05-2020.
Technical Evaluation Result for providing telecom services at NHIDCL Headquarter, Corporate Office, Regional Offices, Project Monitoring Unit and Site Office (Second Call). Dated: 19-05-2020. Read more about Technical Evaluation Result for providing telecom services at NHIDCL Headquarter, Corporate Office, Regional Offices, Project Monitoring Unit and Site Office (Second Call). Dated: 19-05-2020.
Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020. Read more about Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020.
Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020. Read more about Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020.
Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020. Read more about Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020.