Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase “A” in the State of West Bengal (Package-IV A) Read more about Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from Km. 0.000 to Km. 13.000 on EPC basis under SARDP-NE Phase “A” in the State of West Bengal (Package-IV A)
Technical Evaluation Result for Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim. Dated: 20-02-19. Read more about Technical Evaluation Result for Construction of 2-Lane with Paved shoulder including geometric improvement from km 0.000 to km 16.000 of stretch Singtam – Tarku of NH 510 on EPC basis under SARDP –NE phase A in the state of Sikkim. Dated: 20-02-19.
Financial Bid Opening For Hunli-Anini AE Project in the state of Arunachal Pradesh. Dated: 20-02-19. Read more about Financial Bid Opening For Hunli-Anini AE Project in the state of Arunachal Pradesh. Dated: 20-02-19.
Technical Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated: 20-0 Read more about Technical Result for Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Khati Chowk (Km 26.350) of 20.350 Km length in the state of Jammu and Kashmir to be executed on EPC basis. Dated: 20-0
Financial Bid Opening For Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH-150 length 262 Km in the State of Manipur. Package-I: Km 0.00 to Km 185.00. Dated: 15-02-19. Read more about Financial Bid Opening For Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH-150 length 262 Km in the State of Manipur. Package-I: Km 0.00 to Km 185.00. Dated: 15-02-19.
Financial Bid Opening For Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis.Dated: 15-02-19. Read more about Financial Bid Opening For Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis.Dated: 15-02-19.
Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban – Doda) on Batote-Kishtwar-S Read more about Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban – Doda) on Batote-Kishtwar-S
Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kis Read more about Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kis
Financial Evaluation Result along with LoA for Pkg-8 (NH-54) in the state of Mizoram. Dated: 13-02-19. Read more about Financial Evaluation Result along with LoA for Pkg-8 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Financial Evaluation Result along with LoA for Pkg-5 (NH-54) in the state of Mizoram. Dated: 13-02-19. Read more about Financial Evaluation Result along with LoA for Pkg-5 (NH-54) in the state of Mizoram. Dated: 13-02-19.