Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000 Read more about Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000
Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory Read more about Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory
Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Da Read more about Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Da
Technical Score for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Card Read more about Technical Score for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Card
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. D Read more about Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. D
Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22 Read more about Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22
Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se Read more about Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018