Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. D Read more about Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. D
Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22 Read more about Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22
Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se Read more about Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018
Opening of Financial Bids for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.0 Read more about Opening of Financial Bids for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.0
Technical Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamuno Read more about Technical Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamuno
Technical Score For The Project of Consultancy Services for Authority’s Engineer for – (i) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 38 Read more about Technical Score For The Project of Consultancy Services for Authority’s Engineer for – (i) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 38