Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procureme Read more about Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procureme
Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procuremen Read more about Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procuremen
Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement Read more about Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement
Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018. Read more about Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch Read more about Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for the following road stretches in the state of Jammu & Kashmiri)2 Laning of Mughal Road connecting Shopian with Bafliaz in Poonch
Expression of Interest (EOI) for Authority\’s Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japa Read more about Expression of Interest (EOI) for Authority\’s Engineer for Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements of NH-54 in the State of Mizoram on Engineering, Procurement and Construction (EPC) mode, with Japa
The opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 03-12-18. Read more about The opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 03-12-18.
Technical Evaluation Result Construction of Rooftop Cafe at the terrace level of Automated Multilevel Car Parking at Transport Bhawan,1, Parliament Street, New Delhi.Dated: 03-12-18. Read more about Technical Evaluation Result Construction of Rooftop Cafe at the terrace level of Automated Multilevel Car Parking at Transport Bhawan,1, Parliament Street, New Delhi.Dated: 03-12-18.
Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 u Read more about Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 u
Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07 Read more about Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07