Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Pkg-2 (NH-54) in the state of Mizoram. Dated: 08-01-19.

  • Read more about Technical Evaluation Result for Pkg-2 (NH-54) in the state of Mizoram. Dated: 08-01-19.

Financial Bid Opening for Package-8 In Andaman & Nicobar Islands. Dated: 03-01-19.

  • Read more about Financial Bid Opening for Package-8 In Andaman & Nicobar Islands. Dated: 03-01-19.

Technical Evaluation Result for invitation of RFP for DPR consultancy services for western bypass. Dated: 27-12-18.

  • Read more about Technical Evaluation Result for invitation of RFP for DPR consultancy services for western bypass. Dated: 27-12-18.

Opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 27-12-18.

  • Read more about Opening of financial bid for Hunli-Anini AE Project in the state of Arunachal Pradesh.Dated: 27-12-18.

Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.00

  • Read more about Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 50.000 to Km 75.000 (Existing Km 52.370 to Km 79.040) (ii) Design Km 75.000 to Km 95.00

Technical Evaluation result for Consultancy Service for Authority’s Engineer for (i) Construction of alternative highway (Package-IVA from 0.00 to 13.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (ii) Construction of alterna

  • Read more about Technical Evaluation result for Consultancy Service for Authority’s Engineer for (i) Construction of alternative highway (Package-IVA from 0.00 to 13.00 of Bagrakot-Kafer section of NH-717A on EPC mode in state of West Bengal (ii) Construction of alterna

Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procureme

  • Read more about Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 166.00 to km 208.00 (Package-4) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procureme

Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procuremen

  • Read more about Technical Evaluation result for “Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 208.00 to km 250.00 (Package-5) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procuremen

Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement

  • Read more about Technical Evaluation result for Widening and up-gradation to 2-Lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 (Package-7) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on Engineering, Procurement

Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.

  • Read more about Opening of Financial Bid for Operation and Maintenance of 2-Lane Bi-Directional Silkyara Bend – Barkot Tunnel With Escape Passage Including Approaches On Dharasu Yamunotri. Dated: 18-12-2018.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 82
  • Page 83
  • Page 84
  • Page 85
  • Current page 86
  • Page 87
  • Page 88
  • Page 89
  • Page 90
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 10/09/2025

  • Total Visitors: 139771