Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200

Sub Title
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200] [Design Length – 21.500 Km] in the state of Nagaland Under Bharatmala Pariyojna on EPC Mode (Package V).Dated: 20-03-2020.
Year
Tender Date