Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020. Read more about Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 20-02-2020.
Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020 Read more about Technical evaluation result for Empanelment of Advertising Agencies for managing print media advertisements of National Highways & Infrastructure Development Corporation Limited in National and other dailies at DAVP or lesser rates. Dated: 19-02-2020
Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Multilevel Car Parking System at various locations in India (2nd Phase). Dated: 17-02-2020. Read more about Technical evaluation result for Empanelment of Consultants for preparation of Feasibility Report, Architectural & Structural Design of Automated Multilevel Car Parking System at various locations in India (2nd Phase). Dated: 17-02-2020.
Technical evaluation result for Construction of Bi-directional Tunnel at “Km 83” of Length 495 m including approaches road of 664 m and a Major Bridge of 110 m from Km 82+675 to Km 82+925 on NH-244 in Jammu & Kashmir on EPC mode. Dated: 05-02-2020. Read more about Technical evaluation result for Construction of Bi-directional Tunnel at “Km 83” of Length 495 m including approaches road of 664 m and a Major Bridge of 110 m from Km 82+675 to Km 82+925 on NH-244 in Jammu & Kashmir on EPC mode. Dated: 05-02-2020.
Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 03-02-2020. Read more about Technical evaluation result for the Authority’s Engineer for the Meghalaya project(Tura Dalu). Dated: 03-02-2020.
Technical evaluation result for Hiring of Vehicles and drivers for the office use in NHIDCL, HQ, PTI Building, New Delhi on monthly rental basis as well as for as and when requirement.Dated: 16-01-2020. Read more about Technical evaluation result for Hiring of Vehicles and drivers for the office use in NHIDCL, HQ, PTI Building, New Delhi on monthly rental basis as well as for as and when requirement.Dated: 16-01-2020.
Technical evaluation result for selection of Manpower Placement Agency for providing services of Office Staff (such as Stenographers, Office Assistants, Data Entry Operators, Multi-tasking Staff, etc.) at NHIDCL Headquarters, New Delhi. Dated: 09-01-2020. Read more about Technical evaluation result for selection of Manpower Placement Agency for providing services of Office Staff (such as Stenographers, Office Assistants, Data Entry Operators, Multi-tasking Staff, etc.) at NHIDCL Headquarters, New Delhi. Dated: 09-01-2020.
Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length Read more about Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa Read more about Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t Read more about Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t