Technical Evaluation Result for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020. Read more about Technical Evaluation Result for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 16.900 to 30.970 (length 14.070km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.
Technical Evaluation Result for Short Term Improvement of the Road from Km 0.00 (Sirwani Road) to Km 3.00 (Dalep Turning) of NH-510 in the State of Sikkim on Item Rate Basis. Dated: 21-03-2020. Read more about Technical Evaluation Result for Short Term Improvement of the Road from Km 0.00 (Sirwani Road) to Km 3.00 (Dalep Turning) of NH-510 in the State of Sikkim on Item Rate Basis. Dated: 21-03-2020.
Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari Phatak) in the state of Sikkim on Item Rate Basis. Dated: 21-03-2020. Read more about Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari Phatak) in the state of Sikkim on Item Rate Basis. Dated: 21-03-2020.
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state o Read more about Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 76.320 (near Mesulumi Village) to existing km 98.380 (near Chizami Village) [Design Length – 21.50 Km] in the state o
Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200 Read more about Technical Evaluation Result for Construction of two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing km 98.380 (near Chizami Village) to existing km 120.367 (Nagaland/Manipur Border) [Design Km 95.700 to design Km 117.200
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length: 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.Dated: 20-03- Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 6.500 to km 19.300 (Total length: 12.800 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis.Dated: 20-03-
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20- Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length: 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-0 Read more about Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 31.300 to km 45.300 (Total length: 14.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis. Dated: 20-0
Technical Evaluation Result for Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 1. Dated: 18-03-2020. Read more about Technical Evaluation Result for Four Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode – Package – 1. Dated: 18-03-2020.
Technical Evaluation Result for Widening / Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode under NH(O). Dated: 1 Read more about Technical Evaluation Result for Widening / Strengthening to Two laning with hard shoulder of Pallel- Chandel section From Km 0.000 to Km 18.292 of NH-102C in the state of Manipur on Engineering, Procurement & Construction (EPC) Mode under NH(O). Dated: 1