Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020.

  • Read more about Technical Evaluation Result for Restoration of Road by construction of Pucca Drain in selected stretches from km 0.000 to km 170.000 on Batote -Kishtwar- Sinthan Pass Road on NH-244 in the Union Territory of Jammu & Kashmir. Dated: 15-05-2020.

Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020.

  • Read more about Technical Evaluation Result for Beautification of Indira Bye-pass Road from Km 0.000 (Amdo-Golai) to Km 10.117 (Bhojoghari-Phatak) in the state of Sikkim on Item Rate Basis. Dated: 14-05-2020.

Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020.

  • Read more about Technical Evaluation Result for Routine maintenance of Changtongya – Longleng road (NH 702 New) from existing km 00.000 to km 29.530 (length 29.530 km) in the State of Nagaland on Item Rate Basis.Dated: 14-05-2020.

Technical Evaluation Result for Restoration of Road by way of snow clearance, clearance of consolidated slips, surface boulders, side drain, culverts, including the construction of Retaining wall and Breast wall in selected stretches on Goha-Khellani Road

  • Read more about Technical Evaluation Result for Restoration of Road by way of snow clearance, clearance of consolidated slips, surface boulders, side drain, culverts, including the construction of Retaining wall and Breast wall in selected stretches on Goha-Khellani Road

Technical Evaluation Result for Maintenance of Kohima to Mao, (Nagaland/ Manipur border) section of NH-2 from Km. 185.000 to Km. 212.700, L=27.700 km in the State of Nagaland on Item Rate and Work Order Basis.Dated: 12-05-2020.

  • Read more about Technical Evaluation Result for Maintenance of Kohima to Mao, (Nagaland/ Manipur border) section of NH-2 from Km. 185.000 to Km. 212.700, L=27.700 km in the State of Nagaland on Item Rate and Work Order Basis.Dated: 12-05-2020.

Technical Evaluation Result for Restoration of Road by providing & laying of WBMIII, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works in selected stretches& Fixtures of Road safety Furniture from K.

  • Read more about Technical Evaluation Result for Restoration of Road by providing & laying of WBMIII, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works in selected stretches& Fixtures of Road safety Furniture from K.

Technical Evaluation Result for Routine maintenance of Kohima-Jessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis and Work Order Basis- Retender.Dated: 09-04-2020.

  • Read more about Technical Evaluation Result for Routine maintenance of Kohima-Jessami road NH-29 (Old NH 150) from km 0.000 to km 120.000 (length 120 km) in the State of Nagaland on Item Rate Basis and Work Order Basis- Retender.Dated: 09-04-2020.

Technical Evaluation Result for Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EP

  • Read more about Technical Evaluation Result for Construction and up gradation of 4 lane of existing 2 lane with paved shoulder from Hapachara to Tulungia road of NH-117 of existing Km 0.00 to Km 14.050 and (Design KM 0.000 to Km 14.660), (Design length – 14.660 Km) on EP

Technical Evaluation Result for Maintenance of NHIDCL Website & Handling of Social Media accounts of NHIDCL.Dated: 23-03-2020.

  • Read more about Technical Evaluation Result for Maintenance of NHIDCL Website & Handling of Social Media accounts of NHIDCL.Dated: 23-03-2020.

Technical Evaluation Result for RFP for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.

  • Read more about Technical Evaluation Result for RFP for Widening /Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode. Dated: 23-03-2020.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 72
  • Page 73
  • Page 74
  • Page 75
  • Current page 76
  • Page 77
  • Page 78
  • Page 79
  • Page 80
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 28/09/2025