Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and La Read more about Technical Evaluation Result for Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of J&K and La
Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package Read more about Technical Evaluation Result for work of Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the state of West Bengal (Package
Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km] Read more about Technical Evaluation Result for Construction of two-lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length – 10.500 Km]
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 66+000 to km 81+000 (Design Chainage 65+923 to 80+930) of Dokmoka – LoringThepi Section (Section 3) of NH-29 in the state of Assam under Bharatmala Pariyojna
Technical Evaluation Result for Additional Work for Construction of Landslide Protection Gallery, Slope Protection works including Cattle Fence, Restoration of Irrigation Channel and River Protection Work at Bareti, Uttarkashi from Km 100.300 to km 101.06 Read more about Technical Evaluation Result for Additional Work for Construction of Landslide Protection Gallery, Slope Protection works including Cattle Fence, Restoration of Irrigation Channel and River Protection Work at Bareti, Uttarkashi from Km 100.300 to km 101.06
Technical Evaluation Result for Restoration of road by construction of Protection Walls, Cross Drainage Works & Fixtures of Road Safety Furniture from Km 0.000 to Km 170.000 (NH244) on Batote-KishtwarSinthanpass road in UT of Jammu & Kashmir.Dated: 23-07- Read more about Technical Evaluation Result for Restoration of road by construction of Protection Walls, Cross Drainage Works & Fixtures of Road Safety Furniture from Km 0.000 to Km 170.000 (NH244) on Batote-KishtwarSinthanpass road in UT of Jammu & Kashmir.Dated: 23-07-
Technical Evaluation Result for Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’ Read more about Technical Evaluation Result for Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’
Opening of Financial Bid for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (Pkg IA, IB, IIA, IIB, IVA & IVB) in the State of Manipur.Dated: 21-07- Read more about Opening of Financial Bid for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (Pkg IA, IB, IIA, IIB, IVA & IVB) in the State of Manipur.Dated: 21-07-
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 21-07-2020. Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for “construction to 2-Lane Tura Bypass between existing km 95+00 to km 101+00 of NH-51 on EPC mode in the State of Meghalaya. Dated: 21-07-2020.
Technical Evaluation Result for (i)Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of Read more about Technical Evaluation Result for (i)Construction/ up-gradation of existing road to 2-lane with Paved shoulder from km 40.00 (Kafer) to km 61.100 (Lava More) of the Kafer to Reshi border section of NH-717A on EPC Basis under SARDP-NE Phase A in the State of