Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020.

  • Read more about Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020.

Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units(

  • Read more about Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units(

Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha

  • Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha

Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha

  • Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha

Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainam

  • Read more about Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainam

Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020

  • Read more about Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020

Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha

  • Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha

Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha

  • Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha

Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020

  • Read more about Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020

Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21

  • Read more about Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 66
  • Page 67
  • Page 68
  • Page 69
  • Current page 70
  • Page 71
  • Page 72
  • Page 73
  • Page 74
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 28/09/2025