Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020. Read more about Technical Evaluation Result for Construction of Chhiahtlang and Serchhip bypass (Package-1) on Aizawl-Tuipang section of NH-54 in the State of Mizoram on EPC mode, with JICA loan assistance. Dated: 14-09-2020.
Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units( Read more about Technical Evaluation Result for selection of manpower Placement Agency for providing services of Middle Management Personnel (such as IT, Charted accountant, Legal and other professional staff) at NHIDCL Headquarters, New Delhi, Project Monitoring Units(
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha
Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainam Read more about Technical Evaluation Result for Consultancy Services for 09 Months for Supervision of “Restoration and Repairs of NH-129A from 7th mile junction, Dimapur to Mhaikam (Km 0.0 to 16.0) [Length=16 Km] and from Manipur/Nagaland Border (Dzuko Bridge) to Mhainam
Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020 Read more about Technical Evaluation Result for Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP. Dated: 08-09-2020
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder as re-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 58.840 to km 75.00) under SARDP-NE Pha
Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha Read more about Technical Evaluation Result for Construction of 2-lane specification road with Paved shoulder asre-alignment (Greenfield alignment) of existing stretch between Legship to Gyalshing of NH-510 (Design chainage from km 75.000 to km 90.210) under SARDP-NE Pha
Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020 Read more about Technical Evaluation Result for Empanelment of consultants for Comprehensive Flood Management or River Training works/Canal Works/River Front Development to be carried out in various part of India including J&K- Technical result-reg. Dated: 07-09-2020
Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21 Read more about Technical Evaluation Result for Restoration and Repair (R&R) for two lane road of NH-208, from Saikabari to Lentibari (Boarder of Dhalai and Khowai District) (Ch 61.00 Km to Ch 85.200 km) (Total Length=24.200 Km) in the state of Tripura in the FY 2020-21