Financial Bid Opening For Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH-150 length 262 Km in the State of Manipur. Package-I: Km 0.00 to Km 185.00. Dated: 15-02-19. Read more about Financial Bid Opening For Rehabilitation of existing Stretch of Churachandpur to Tipaimukh section of NH-150 length 262 Km in the State of Manipur. Package-I: Km 0.00 to Km 185.00. Dated: 15-02-19.
Financial Bid Opening For Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis.Dated: 15-02-19. Read more about Financial Bid Opening For Rehabilitation/ Restoration of Hunli Anini Road from Km 0.00 to Km 21.500 in the State of Arunachal Pradesh on EPC basis.Dated: 15-02-19.
Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban – Doda) on Batote-Kishtwar-S Read more about Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 0.000 to Km 80.000 (Ramban – Doda) on Batote-Kishtwar-S
Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kis Read more about Technical Evaluation Result for Restoration of Road by providing & laying of WBM-III, Bituminous Macadam & Bituminous Concrete including construction of Protection walls, Cross Drainage works from Km 80.000 to Km 170.000 (Kishtwar – Chatroo) on Batote-Kis
Financial Evaluation Result along with LoA for Pkg-8 (NH-54) in the state of Mizoram. Dated: 13-02-19. Read more about Financial Evaluation Result along with LoA for Pkg-8 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Financial Evaluation Result along with LoA for Pkg-5 (NH-54) in the state of Mizoram. Dated: 13-02-19. Read more about Financial Evaluation Result along with LoA for Pkg-5 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Financial Evaluation Result along with LoA for Pkg-4 (NH-54) in the state of Mizoram. 13-02-19. Read more about Financial Evaluation Result along with LoA for Pkg-4 (NH-54) in the state of Mizoram. 13-02-19.
Financial Evaluation Result along with LoA for Pkg-3 (NH-54) in the state of Mizoram. Dated: 13-02-19. Read more about Financial Evaluation Result along with LoA for Pkg-3 (NH-54) in the state of Mizoram. Dated: 13-02-19.
Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir.Dated: 09-02-19. Read more about Technical Evaluation Result for Providing & supplying of commercial vehicle 6 Nos. (01 Innova & 05 Bolero or equivalent) on monthly basis for NHIDCL Branch Office-Jammu in the State of Jammu & Kashmir.Dated: 09-02-19.
Financial bid publish for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Flyers, Leaflets, Invitation Cards (including envelopes), Letter Heads, etc, for NHIDCL, Ne Read more about Financial bid publish for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Flyers, Leaflets, Invitation Cards (including envelopes), Letter Heads, etc, for NHIDCL, Ne