Sorry, you need to enable JavaScript to visit this website.

Technical evaluation result for Four-lane Bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127B (Design length 19.282 km) in the State of Assam/ Meghalaya under the scheme of’ North-East Road

Sub Title
Technical evaluation result for Four-lane Bridge including approaches over river Brahmaputra between Dhubri on North Bank and Phulbari on South Bank on NH-127B (Design length 19.282 km) in the State of Assam/ Meghalaya under the scheme of’ North-East Road Network Connectivity Project on EPC mode under JICA Phase-03. Dated: 28-08-2019.
Year
Tender Date