Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 u

  • Read more about Technical Evaluation Result Construction and Upgradation including specialized slope treatment of existing road to 2-lane with the paved shoulder from existing km. 458.900 to km. 459.475 (design ch 456.200 to ch 456.800) of Patalganga landslide of NH-07 u

Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07

  • Read more about Technical Evaluation Result Construction and Upgradation including specialized slope treatment and augment of existing road from Km. 379+100 to Km. 380+275 (approx. 1.175 km) on Gholteer Landslide of National Highway No. 07 (hereinafter called the “NH-07

Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000

  • Read more about Financial Bid Opening For Consultancy Services for Authority’s Engineer for Supervision of “Two lane with hard shoulders of Chakabama-Zunheboto Road from (i) Design Km 0.000 to Km 25.000 (Existing Km 0.000 to Km 25.760) (ii) Design Km 25.000 to Km 50.000

Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory

  • Read more about Technical Evaluation Result For Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of “In- Principle” declared NH in the Car Nicobar Island under the Union Territory

Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Da

  • Read more about Technical Evaluation Result For Periodical Renewal for Rangpo-Gangtok section for Km 52+000 to Km 80+000(Excluding Km 63.00 to Km 66.00 and Km 69.00 to Km 72.00) of NH-10 including raising in 200 m length in Sinking area in Km 80 in the state of Sikkim Da

Technical Score for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Card

  • Read more about Technical Score for Selection of agency/ agencies for entering into Annual Rate Contract for providing services of Designing, Printing of document(s) such as Books/ Annual Report(s), Booklets, Flyers, Leaflets, File Covers, Visiting Cards, Invitation Card

Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. D

  • Read more about Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of National Highway No. 217(Paikan-Tura Section) in the state of Assam/Meghalaya. D

Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22

  • Read more about Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22

Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se

  • Read more about Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se

Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018

  • Read more about Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 84
  • Page 85
  • Page 86
  • Page 87
  • Current page 88
  • Page 89
  • Page 90
  • Page 91
  • Page 92
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 28/09/2025