Revised Technical Evaluation Result For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (i Read more about Revised Technical Evaluation Result For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Merangkong-Tamlu-Mon Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 20.456) (i
Technical Result For The Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis Read more about Technical Result For The Project of Up-gradation to 4-lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Ganesh Vihar (Km 6.000) to Hanuman chowk (Km 30.000) of 24 Km length in the state of Jammu and Kashmir to be executed on EPC basis
Technical Evaluation Result For The Project Of Short Term Improvement & Routine Maintenance From Km. 52.000 To Km. 80.000 Of NH-10 In The State Of Sikkim On Percentage Rate Basis. Dated : 03-07-2018 Read more about Technical Evaluation Result For The Project Of Short Term Improvement & Routine Maintenance From Km. 52.000 To Km. 80.000 Of NH-10 In The State Of Sikkim On Percentage Rate Basis. Dated : 03-07-2018
Technical Evaluation Result for the Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 145.00 to km 220.00 (length 75.00km) in the State of Manipur on Item Rate Basis (Package- III) Dated : 22-06-2018 Read more about Technical Evaluation Result for the Project of Short term improvement & Routine maintenance of Imphal- Jiribam road NH-37 from km 145.00 to km 220.00 (length 75.00km) in the State of Manipur on Item Rate Basis (Package- III) Dated : 22-06-2018
Revised Technical Evaluation Result for the Project of Restoration / Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 19-06-2018 Read more about Revised Technical Evaluation Result for the Project of Restoration / Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 19-06-2018
1st Stage Re-Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotr Read more about 1st Stage Re-Evaluation Result for the Project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Tharthri-Kahaljugasar-Kilhotr
Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Rehabilitaion / Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km Read more about Technical Evaluation Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Rehabilitaion / Maintenance of newly entrusted Churachandpur-Singhat-Sinzawl Tuivai road section from (i) Km 0.00 to km 34.5 (ii) Km 34.5 to Km
Revised Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Lanin Read more about Revised Technical Evaluation Result for the Project of Consultancy services for Authority’s Engineer for Supervision of Four Laning of Imphal – Moreh Section of NH 39 from Km 330.000 to Km 350.000 in the State of Manipur (Contract Package I) and Two Lanin
Technical Evaluation Result for the Project of Restoration/Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 12-06-2018 Read more about Technical Evaluation Result for the Project of Restoration/Reconstruction of Churachandpur-Tipaimukh road from km 185.00 (Bukpi) to Km 262.00 (Tipaimukh) in the state of Manipur on EPC mode. Dated : 12-06-2018
Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala Read more about Technical Evaluation Result for the Project of Consultancy Services for preparation of DPR for development of Economic Corridors and International Connectivity Routes to improve the efficiency of freight movement in the state of Nagaland under Bharatmala