Final evaluation results for Bharatmala project, Sikkim. Read more about Final evaluation results for Bharatmala project, Sikkim.
Final evaluation results for Bharatmala project, Uttarakhand. Read more about Final evaluation results for Bharatmala project, Uttarakhand.
Technical score for bharatmala projects in the state of Jammu and Kashmir. Read more about Technical score for bharatmala projects in the state of Jammu and Kashmir.
Technical score for Consultancy Services for Authority Engineer (i) Pasighat to Bomjur Section of NH-52 (ii) Singer River to Sizoh Nallah Section of NH-513 in Arunachal Pradesh. Read more about Technical score for Consultancy Services for Authority Engineer (i) Pasighat to Bomjur Section of NH-52 (ii) Singer River to Sizoh Nallah Section of NH-513 in Arunachal Pradesh.
Opening of Financial Bid for Consultancy Services for Authority Engineer for project of 2 Laning of Akajan – Likabali – Bame road (i) Km 12.00 to 33.00 and (ii) Km 33.00 to Km 65.00 (State Road) in Arunachal Pradesh under SARDP on EPC basis. Read more about Opening of Financial Bid for Consultancy Services for Authority Engineer for project of 2 Laning of Akajan – Likabali – Bame road (i) Km 12.00 to 33.00 and (ii) Km 33.00 to Km 65.00 (State Road) in Arunachal Pradesh under SARDP on EPC basis.
Final evaluation results for Bharatmala project, Assam & West Bengal. Read more about Final evaluation results for Bharatmala project, Assam & West Bengal.
Final evaluation results for Bharatmala project, Tripura. Read more about Final evaluation results for Bharatmala project, Tripura.
Final evaluation results for Bharatmala project, Himachal Pradesh. Read more about Final evaluation results for Bharatmala project, Himachal Pradesh.
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i)4-laning of Dimapur – Kohima Road from design km 123.840 to km 138.775 (Existing km 124.100 to km 140.000) (Package-I), (ii) 4-laning of Dimapur – Kohima Road from design km 138.775 to k Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i)4-laning of Dimapur – Kohima Road from design km 123.840 to km 138.775 (Existing km 124.100 to km 140.000) (Package-I), (ii) 4-laning of Dimapur – Kohima Road from design km 138.775 to k
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION” of (i) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg –