Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for the project of Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam On Engineering, Procurement & Construc

  • Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam On Engineering, Procurement & Construc

Technical Evaluation Result for the project of Construction and upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phas

  • Read more about Technical Evaluation Result for the project of Construction and upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phas

Technical Evaluation Result for the project of Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 75.00 to Km 145.00 (Length=70 Km) of NH-53 (New NH-37) (Package-II) in the state of Manipur.

  • Read more about Technical Evaluation Result for the project of Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 75.00 to Km 145.00 (Length=70 Km) of NH-53 (New NH-37) (Package-II) in the state of Manipur.

Technical Evaluation Result for the project of Short Term Improvement and Routine maintenance of Imphal- Jiribam Road from Km 3.00 to Km 75.00 (Length 72 km ) of NH-53 (New NH-37) (Package-I) in the state of Manipur

  • Read more about Technical Evaluation Result for the project of Short Term Improvement and Routine maintenance of Imphal- Jiribam Road from Km 3.00 to Km 75.00 (Length 72 km ) of NH-53 (New NH-37) (Package-I) in the state of Manipur

Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nic

  • Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nic

Technical Evaluation Result for the project of Restoration/Reconstruction of Churachandpur to Tuivai(NH- 102B) road from km 103.10 to Km 161.48 (58.38 Km) in the state of Manipur on EPC mode.

  • Read more about Technical Evaluation Result for the project of Restoration/Reconstruction of Churachandpur to Tuivai(NH- 102B) road from km 103.10 to Km 161.48 (58.38 Km) in the state of Manipur on EPC mode.

Technical Evaluation Result for the project of Construction of Major Bridge over Humphrey Strait Creek between Km. 129.420 to Km. 130.600 of NH-223 (New No. NH-4) connecting Middle & North Andaman Islands in the Union Territory of Andaman & Nicobar Island

  • Read more about Technical Evaluation Result for the project of Construction of Major Bridge over Humphrey Strait Creek between Km. 129.420 to Km. 130.600 of NH-223 (New No. NH-4) connecting Middle & North Andaman Islands in the Union Territory of Andaman & Nicobar Island

Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of selected road stretch/corridor to Twolane with paved shoulders NH

  • Read more about Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of selected road stretch/corridor to Twolane with paved shoulders NH

Technical Evaluation Score for project of Consultancy Services for Authority’s Engineer for Project of (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru o

  • Read more about Technical Evaluation Score for project of Consultancy Services for Authority’s Engineer for Project of (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru o

Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam an

  • Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam an

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 107
  • Page 108
  • Page 109
  • Page 110
  • Current page 111
  • Page 112
  • Page 113
  • Page 114
  • Page 115
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 06/09/2025

  • Total Visitors: 127675