Technical Evaluation Result for the project of Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam On Engineering, Procurement & Construc Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of Tura-Mankachar road from Mirjumala junction to Mankachar-Silchar Tinali (0/0 to 1/660km) to two lane carriageway in the State of Assam On Engineering, Procurement & Construc
Technical Evaluation Result for the project of Construction and upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phas Read more about Technical Evaluation Result for the project of Construction and upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phas
Technical Evaluation Result for the project of Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 75.00 to Km 145.00 (Length=70 Km) of NH-53 (New NH-37) (Package-II) in the state of Manipur. Read more about Technical Evaluation Result for the project of Short Term Improvement & Routine Maintenance of Imphal-Jiribam Road from Km 75.00 to Km 145.00 (Length=70 Km) of NH-53 (New NH-37) (Package-II) in the state of Manipur.
Technical Evaluation Result for the project of Short Term Improvement and Routine maintenance of Imphal- Jiribam Road from Km 3.00 to Km 75.00 (Length 72 km ) of NH-53 (New NH-37) (Package-I) in the state of Manipur Read more about Technical Evaluation Result for the project of Short Term Improvement and Routine maintenance of Imphal- Jiribam Road from Km 3.00 to Km 75.00 (Length 72 km ) of NH-53 (New NH-37) (Package-I) in the state of Manipur
Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nic Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of NH-223 from Km 12.0 to 45.0 (Beodnabad -Ferrargunj Section) excluding section between Km 21.0 to Km 28.0,to 2-Lane with hard shoulder in the Union Territory of Andaman & Nic
Technical Evaluation Result for the project of Restoration/Reconstruction of Churachandpur to Tuivai(NH- 102B) road from km 103.10 to Km 161.48 (58.38 Km) in the state of Manipur on EPC mode. Read more about Technical Evaluation Result for the project of Restoration/Reconstruction of Churachandpur to Tuivai(NH- 102B) road from km 103.10 to Km 161.48 (58.38 Km) in the state of Manipur on EPC mode.
Technical Evaluation Result for the project of Construction of Major Bridge over Humphrey Strait Creek between Km. 129.420 to Km. 130.600 of NH-223 (New No. NH-4) connecting Middle & North Andaman Islands in the Union Territory of Andaman & Nicobar Island Read more about Technical Evaluation Result for the project of Construction of Major Bridge over Humphrey Strait Creek between Km. 129.420 to Km. 130.600 of NH-223 (New No. NH-4) connecting Middle & North Andaman Islands in the Union Territory of Andaman & Nicobar Island
Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of selected road stretch/corridor to Twolane with paved shoulders NH Read more about Technical Evaluation Result for the project of Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of selected road stretch/corridor to Twolane with paved shoulders NH
Technical Evaluation Score for project of Consultancy Services for Authority’s Engineer for Project of (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru o Read more about Technical Evaluation Score for project of Consultancy Services for Authority’s Engineer for Project of (i) 154 m span Steel Superstructure Bridge at Km 145.09 over River Barak and (ii) 122 m span Steel Superstructure Bridge at Km 189.80 over River Makru o
Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam an Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of Doimukh-Harmuti road from Harmuti Junction (0/00 km) to Khula camp (14/370 km) and Doimukh (0/000 km) to Bagh Tinali (3/100 km) two lane carriageway in the State of Assam an