Skip to main content
  • भारत सरकार | Government of India
  • Feedback
  • Sitemap
  • Skip to Main Content
  • Screen Reader Access
  • A+ A A -
  • A A
  • Control Room No. - 9205949400, 011-26768950
Logo

National Highways & Infrastructure Development Corporation Limited

Ministry of Road Transport & Highways
Logo
  • Home
  • About
    • About Us
      • Our Organisation
      • Our Mission
      • Our Vision
      • Board of Directors
    • Honourable Minister’s Message
    • Annual Reports
    • CSR
    • Annual Return of NHIDCL
    • Skill Development & Training Programs
    • International Cooperation
    • RTI
    • Memorandum of Association
    • Internal Complaints Committee (ICC)
    • Chief Vigilance officer (CVO)
    • Independent External Monitor (IEM)
  • Our Presence
    • Arunachal Pradesh
    • Andaman & Nicobar
    • Assam
    • Manipur
    • Meghalaya
    • Mizoram
    • Nagaland
    • Sikkim
    • Tripura
    • UT of J&K (Jammu)
    • UT of J&K (Kashmir)
    • UT of Ladakh
    • Uttarakhand
    • West Bengal
  • Projects
    • Ongoing/Completed Projects
  • Tenders
    • Current Tenders
    • Tender Archive
    • Blacklist / Debarment
    • Termination
    • Non-Performer
    • Approved Banks
  • Events
    • Blogs
    • Events
    • Videos
    • Official Language Gallery
  • Gallery
  • Links
    • NHIDCL Portals
      • Bank of Ideas
      • NHIDCL Email
      • BG Management
      • eDMS
      • SAP
      • Employee Portal
    • MoRT&H Portals
      • INAM-Pro
      • INFRACON
      • Bhoomirashi
      • PMIS
      • BiMS
      • MoRT&H NOC
      • MoRT&H Attention
    • Other Links/Portals
  • e-RESOURCES
    • Manual
    • Act & Rules
    • Circulars
  • Career
    • Current Openings
    • Archive
  • Contact
Corporate Login

Breadcrumb

  1. Home
  2. Node
 BACK

Technical Evaluation Result for the project of Rehabilitation and up-gradation of Wokha Merapani Road from Wokha Junction (0/000 km) to (26/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode.

  • Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of Wokha Merapani Road from Wokha Junction (0/000 km) to (26/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode.

Technical Evaluation Result for the project of Rehabilitation and up-gradation of section from Km 242.0 to 298.0 of NH-223 (New NH- 4) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC Basis. (Package-II).

  • Read more about Technical Evaluation Result for the project of Rehabilitation and up-gradation of section from Km 242.0 to 298.0 of NH-223 (New NH- 4) to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on EPC Basis. (Package-II).

Technical Evaluation Result for the project of Two-Laning of Akajan – Likabali – Bame Road on EPC basis from existing Km 71.000 to Km 99.000(design Km. 65.810 to Km. 91.928) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Co

  • Read more about Technical Evaluation Result for the project of Two-Laning of Akajan – Likabali – Bame Road on EPC basis from existing Km 71.000 to Km 99.000(design Km. 65.810 to Km. 91.928) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Co

Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai r

  • Read more about Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tuivai r

Technical Evaluation Result for the project of Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC mode.

  • Read more about Technical Evaluation Result for the project of Four laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC mode.

Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of Demwe-Br

  • Read more about Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration of Demwe-Br

Technical Evaluation Result for the project of Rehabilitation of existing churachandpur- singhat – Tuivai road on NH- 102B between Km 0.000 to Km 34.5 (Length 34.50 Km) in the state of Manipur on EPC Basis (2nd call)

  • Read more about Technical Evaluation Result for the project of Rehabilitation of existing churachandpur- singhat – Tuivai road on NH- 102B between Km 0.000 to Km 34.5 (Length 34.50 Km) in the state of Manipur on EPC Basis (2nd call)

Technical Evaluation Result for the project of Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road section from km 70.00 to Km 90.00 covering 20 Km length on NH-102A in the state of Manipur.

  • Read more about Technical Evaluation Result for the project of Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road section from km 70.00 to Km 90.00 covering 20 Km length on NH-102A in the state of Manipur.

Technical Evaluation Result for the project of Restoration/ Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 90.00 to Km 115.00 covering 25 Km length on NH-102A in the state of Manipur.

  • Read more about Technical Evaluation Result for the project of Restoration/ Reconstruction of Ukhrul-Toloi-Tadubi road section from Km 90.00 to Km 115.00 covering 25 Km length on NH-102A in the state of Manipur.

Technical Evaluation Result for the project of Construction of Extra-dosed/ Cable Stayed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 in the state of Tripura on EPC mode.

  • Read more about Technical Evaluation Result for the project of Construction of Extra-dosed/ Cable Stayed RCC Bridge including viaduct and approaches over river Feni at Sabroom on Indo-Bangladesh Border on NH-8 in the state of Tripura on EPC mode.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 104
  • Page 105
  • Page 106
  • Page 107
  • Current page 108
  • Page 109
  • Page 110
  • Page 111
  • Page 112
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
National Portal of India Swachh Bharat Mission IAHE https://esamiksha.gov.in/ Public Grievance My Gov

Footer

  • Terms & Conditions
  • Website Policies
  • Web Information Manager
  • Help
  • FAQ
  • Feedback

Copyright © 2024 National Highways & Infrastructure Development Corporation Limited, Government of India.
All Rights Reserved.

Last Updated: 07/09/2025

  • Total Visitors: 130733