Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double Read more about Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double
Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Namchi-Ravangla-Tashidi Read more about Technical Evaluation Score for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Namchi-Ravangla-Tashidi
Technical Evaluation Result for the project of Consultancy Service for Authority’S Engineer for (i) Construction of 1000m length Viaduct at Rangpo between km 51.100 to km 53.900 on Sevoke –Gangtok Road NH-10 (Old NH-31A) in the State of West Bengal/Sikkim Read more about Technical Evaluation Result for the project of Consultancy Service for Authority’S Engineer for (i) Construction of 1000m length Viaduct at Rangpo between km 51.100 to km 53.900 on Sevoke –Gangtok Road NH-10 (Old NH-31A) in the State of West Bengal/Sikkim
Technical Evaluation Result for the project of Consultancy Services for Additional Topographical, Geological/ Geotechnical Survey and data collection from Km.85.00 to 95.00, 101.00 to 145.00 to 2- Lane with paved shoulders of Tura – Dalu of NH-51 in the S Read more about Technical Evaluation Result for the project of Consultancy Services for Additional Topographical, Geological/ Geotechnical Survey and data collection from Km.85.00 to 95.00, 101.00 to 145.00 to 2- Lane with paved shoulders of Tura – Dalu of NH-51 in the S
Latest Technical Evaluation Score for the project of Consultancy Service for Authority’S Engineer for (i) Construction of 1000m length Viaduct at Rangpo between km 51.100 to km 53.900 on Sevoke –Gangtok Road NH-10 (Old NH-31A) in the State of West Bengal/ Read more about Latest Technical Evaluation Score for the project of Consultancy Service for Authority’S Engineer for (i) Construction of 1000m length Viaduct at Rangpo between km 51.100 to km 53.900 on Sevoke –Gangtok Road NH-10 (Old NH-31A) in the State of West Bengal/
Technical Evaluation Result for the project of Consultancy Services for Topographical, Traffic, Geological / Geotechnical Survey and Data collection for widening and upgradation of National Highways in the North East Region (NER) of India. Read more about Technical Evaluation Result for the project of Consultancy Services for Topographical, Traffic, Geological / Geotechnical Survey and Data collection for widening and upgradation of National Highways in the North East Region (NER) of India.
Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing K Read more about Technical Evaluation Score for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing K
Latest Technical Evaluation Score for the project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration from Read more about Latest Technical Evaluation Score for the project of Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of Two Laning with paved shoulder NH configuration from
Financial Evaluation Result for the project of Four Laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC mode. Read more about Financial Evaluation Result for the project of Four Laning of Dolabari to Jamuguri section from km 17.300 of NH-37A to km 182.000 of NH-52 in the State of Assam under SARDP- NE, Phase A on EPC mode.
Financial Evaluation Result for the project of Rehabilitation and up-gradation of Wokha-Merapani Road from (26/000 km) to (48/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode. Read more about Financial Evaluation Result for the project of Rehabilitation and up-gradation of Wokha-Merapani Road from (26/000 km) to (48/000 km) in the State of Nagaland” on Engineering, Procurement & Construction (EPC) Mode.