Technical Evaluation Result for the project of Consultancy Services for Authority Engineer for Supervision of “Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypas Read more about Technical Evaluation Result for the project of Consultancy Services for Authority Engineer for Supervision of “Construction of Four/Six laning from Km 132.375 to Km 158.058 (Total New Alignment length of 20.683 Km) of Daboka Dimapur Section (Dimapur Bypas
Technical Evaluation Result for the project of Consultancy Services for Preparation of Detailed Project Report for Construction of 2-Lane Bridge for Connectivity of Port Blair – Chatham Island and Bambooflat with 400 M Navigational span in the Union Terri Read more about Technical Evaluation Result for the project of Consultancy Services for Preparation of Detailed Project Report for Construction of 2-Lane Bridge for Connectivity of Port Blair – Chatham Island and Bambooflat with 400 M Navigational span in the Union Terri
New Technical Evaluation Result for the project of Consultancy Services For Authority’s Engineer For (i) Rehabilitation and Up-gradation of Beodnabad – Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-La Read more about New Technical Evaluation Result for the project of Consultancy Services For Authority’s Engineer For (i) Rehabilitation and Up-gradation of Beodnabad – Ferrargunj Section of NH-223 (New NH-4) from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-La
Technical Evaluation Result for the project of Renovation of 32 Office rooms in Transport Bhawan of Ministry of Shipping, New Delhi –110001. Dated: 22-09-2017 Read more about Technical Evaluation Result for the project of Renovation of 32 Office rooms in Transport Bhawan of Ministry of Shipping, New Delhi –110001. Dated: 22-09-2017
New Technical Evaluation Result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tui Read more about New Technical Evaluation Result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of (i) 2 laning with paved shoulder of Churachandpur -Tui
Technical Evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from (i) design Km. 20+000 to Km. 32+050 [Existing Km 20.000 to Km Read more about Technical Evaluation result for the project of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two-Laning of Joram – Koloriang Road (NH-713) on EPC basis from (i) design Km. 20+000 to Km. 32+050 [Existing Km 20.000 to Km
Final Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 12 Read more about Final Technical Evaluation result for the project of Consultancy Services for Carrying out Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services in respect of 2 laning of (i) Maram-Peren-Dimapur section on NH 12
Technical Evaluation result for the project of Construction of Road, Bridge and Slope Protection Works of Landslide at Bareti (Ex.km 100.300 to Km 101.60 of NH-34) in the State of Uttarakhand on EPC basis. Dated : 11-09-2017 Read more about Technical Evaluation result for the project of Construction of Road, Bridge and Slope Protection Works of Landslide at Bareti (Ex.km 100.300 to Km 101.60 of NH-34) in the State of Uttarakhand on EPC basis. Dated : 11-09-2017
Technical Score for the Project Of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of Read more about Technical Score for the Project Of Consultancy Services for Authority’s Engineer for Supervision of “Construction of Two- Laning of Existing Khupa – Hayuliang – Hawai Road on EPC basis from (i) design Km. 0.000 (Khupa) to Km. 17.000 [Existing Km 95.800 of
Financial Evaluation result for the project of Selection of NGO to assist in resettlement plan implementation for IMPHAL – MOREH road in the state of Manipur. Dated : 05-09-2017 Read more about Financial Evaluation result for the project of Selection of NGO to assist in resettlement plan implementation for IMPHAL – MOREH road in the state of Manipur. Dated : 05-09-2017