Sub Title
Technical Evaluation Result for the project of Two-Laning of Akajan – Likabali – Bame Road on EPC basis from existing Km 71.000 to Km 99.000(design Km. 65.810 to Km. 91.928) in the state of Arunachal Pradesh under SARDP-NE On Engineering, Procurement & Construction (EPC) Mode.
Upload file
Year