Technical Evaluation Result for for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/M Read more about Technical Evaluation Result for for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/M
Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, bef Read more about Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, bef
Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Prade Read more about Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Prade
Technical Evaluation Result for Four laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design Chainage 38.600 (End of proposed Badarpur Bypass) to km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hyb Read more about Technical Evaluation Result for Four laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design Chainage 38.600 (End of proposed Badarpur Bypass) to km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hyb
Technical Evaluation Result for Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Miz Read more about Technical Evaluation Result for Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Miz
Technical Evaluation Result for Construction of Intermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 17.387 (Total length 17.387 km) of Hunli to Ithun Bridge section on NH-913 (Frontier Highway) in State of Arunachal Pradesh” on E Read more about Technical Evaluation Result for Construction of Intermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 17.387 (Total length 17.387 km) of Hunli to Ithun Bridge section on NH-913 (Frontier Highway) in State of Arunachal Pradesh” on E
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: Read more about Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Basam-Thathi-Amaha and Bruni-Lama Camp-Kangri’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length:
Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach Read more about Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach
Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach Read more about Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach
Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE Read more about Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE