Technical Evluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no. Bridge from Ch. 450.00 to Ch. 468.00 (18 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-III). Read more about Technical Evluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones and 1 no. Bridge from Ch. 450.00 to Ch. 468.00 (18 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-III).
Technical Evaluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II). Read more about Technical Evaluation Result for Construction for Mitigation Measures of 05 Nos. Landslides, 05 Nos. Sinking Zones from Ch. 433.00 to Ch. 450.00 (17 Km. length) on NH-07 on EPC mode in the State of Uttarakhand (Package-II).
Technical Evaluation Result for Construction for mitigation measures of 10 nos. of Landslides, 01 no. Sinking Zone and 01 no. minor bridge from Km 386.000 to Km 433.000 (65 km length) on NH-07 on EPC mode in the State of Uttarakhand, PKG-I. Read more about Technical Evaluation Result for Construction for mitigation measures of 10 nos. of Landslides, 01 no. Sinking Zone and 01 no. minor bridge from Km 386.000 to Km 433.000 (65 km length) on NH-07 on EPC mode in the State of Uttarakhand, PKG-I.
Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach Read more about Technical Evaluation Result for Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-III) from design Km 60.000 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunach
Technical Evaluation Result for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode.. Read more about Technical Evaluation Result for Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (Package-2) on Sairang – Phaibawk section of NH-6 in the State of Mizoram on EPC Mode..
Technical Evaluation Result for for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/M Read more about Technical Evaluation Result for for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/M
Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, bef Read more about Technical Evaluation Result for Widening/Improvement to 4 lane with paved shoulder from Ch. 5.580 km to Ch. 25.633 km (Design Ch. 0.000 km to Ch. 17.737 km) for Package-1 of Bilasipura – Guwahati Road (NH-17) (Section: Near Chirakuta to near Mowatari, bef
Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Prade Read more about Technical Evaluation Result Construction of Intermediate Lane with Hard Shoulder of Hunli to Hayuliang (Package-I) from Design Km 0.000 to Km 53.000 (Design Length 53.000 km, Greenfield) Section of Frontier Highway (NH-913) in the State of Arunachal Prade
Technical Evaluation Result for Four laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design Chainage 38.600 (End of proposed Badarpur Bypass) to km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hyb Read more about Technical Evaluation Result for Four laning of Badarpur – Churaibari section of NH-37 & NH-8 from Design Chainage 38.600 (End of proposed Badarpur Bypass) to km 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hyb
Technical Evaluation Result for Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Miz Read more about Technical Evaluation Result for Construction of Four Laning of Mualkhang – Sairang Section (Package 8) of NH-6 from existing chainage km142+000 to km158+900 (Design Chainage km 123+400 to km 136+260) on Silchar-Vairengte – Sairang road in the state of Miz