Technical Evaluation Result for Four Laning of Silchar – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km. 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hyb Read more about Technical Evaluation Result for Four Laning of Silchar – Churaibari section of NH-37 & NH-8 from Design chainage 38.600 (End of proposed Badarpur Bypass) to Km. 62.800 (Start of proposed Nilambazar/Cheragi Bypass) in the state of Assam (Package-IV) on Hyb
Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE Read more about Technical Evaluation Result for Construction of Balance Work of 4-laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875): Pkg-II: Structures, under SARDP-NE
Technical Evaluation Result for Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Par Read more about Technical Evaluation Result for Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Par
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch.52.470 Km (Design Ch.21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road(NH-17) (Section: Near Mowatari, before Chapar Byp Read more about Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 25.633 Km to Ch.52.470 Km (Design Ch.21.850 Km to Ch.48.670 Km) for Package-2 of Bilasipura- Guwahati road(NH-17) (Section: Near Mowatari, before Chapar Byp
Technical Evaluation Result Slope protection works for the work of Construction of Four Lane Dimapur — Kohima Road from design km 152.490 to km 166.700 (Existing km 156.000 to km 172.900) Excluding Dimapur & Kohima Bypass, in the state of Nagaland under S Read more about Technical Evaluation Result Slope protection works for the work of Construction of Four Lane Dimapur — Kohima Road from design km 152.490 to km 166.700 (Existing km 156.000 to km 172.900) Excluding Dimapur & Kohima Bypass, in the state of Nagaland under S
Technical Evaluation Result for Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Enginee Read more about Technical Evaluation Result for Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Enginee
Technical Evaluation Result for Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construc Read more about Technical Evaluation Result for Construction of RCC Box Cell Viaduct by Box Pushing Method at chainage Km 157+200 to Km 157+500 along with other ancillary works on NH-29 in the State of Nagaland under SARDP-NE through Engineering, Procurement and Construc
Technical Evaluation Result for Construction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP-NE Read more about Technical Evaluation Result for Construction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP-NE
Technical Evaluation Result for Construction of Balance works of Major Bridge over Middle Strait Creek between Km. 106.590 to km 108.553 of NH-04 connecting South Andaman &Baratang Island in the Union Territory of Andaman & Nicobar Islands on EPC Basis (3 Read more about Technical Evaluation Result for Construction of Balance works of Major Bridge over Middle Strait Creek between Km. 106.590 to km 108.553 of NH-04 connecting South Andaman &Baratang Island in the Union Territory of Andaman & Nicobar Islands on EPC Basis (3
Technical Evaluation Result for Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Par Read more about Technical Evaluation Result for Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam under Bharatmala Par