| Sr. No. | Descriptions | State | Bid Due Date Sort ascending | Bid Due Date - (Revised) | Tender ID | View Details |
|---|---|---|---|---|---|---|
| 61 | Request for Proposal (RFP) for Hiring of Vehicles on Monthly Basis for NHIDCL, PMU-Kishtwar & Site-Office Chatroo. | Union Territory of Jammu and Kashmir | 23-02-2026 | View Details | ||
| 62 | Rectification work of damaged stretch on the project i.e., “Rehabilitation and Up-gradation of section from Km 181.00 to Km 206.00 in Andaman Trunk Road of NH-04 to Intermediate Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length: 25.00 Km) on EPC Mode (Package-VII)” at the Risk & Cost of existing EPC Contractor, on percentage Rate Basis in the FY 2025-26 | Andaman and Nicobar | 21-02-2026 | View Details | ||
| 63 | Short Term Maintenance Contract (STMC) for (a) from Km 61.100 (at Lava More) to Km 79.700 (at Algarah Bypass) i.e. Pkg VA-(i) and (b) from Km 25.600 (at Barbot) to Km 26.100 (at Nimbong) i.e. Pkg- IV-C under the jurisdiction of PMUKalimpong, NHIDCL, in the State of West Bengal on Percentage Rate Contract Basis during the FY 2025-26 | West Bengal | 20-02-2026 | View Details | ||
| 64 | Performance based Maintenance Contracts (PBMC) for One-Time Improvement (OTI) of Bypass Section of Pedong Town Road (5.50 km) and Barbot Bazar Road (0.45 km) in the state of West Bengal in FY 2025-26. | West Bengal | 20-02-2026 | 05-03-2026 | View Details | |
| 65 | TENDER FOR HIRING OF MANPOWER PLACEMENT AGENCY FOR PROVIDING MANPOWER SERVICES SUCH AS SAP CONSULTANT, YOUNG LEGAL PROFESSIONAL, IT ENGINEER, ACCOUNTANT, OFFICE ASSISTANT, DATA ENTRY OPERATOR, PERSONAL ASSISTANT, STENOGRAPHER, MULTI-TASKING STAFF ETC. FOR NHIDCL, REGIONAL OFFICE GANGTOK AND ITS PMUs & SOs IN THE STATE OF SIKKIM | Sikkim | 20-02-2026 | View Details | ||
| 66 | Invitation of tender for Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode. (iii) 4-Laning from Rangagara to Kaliabhor Tiniali from km 297.00 to km 315.315 of NH-37 on EPC basis. (iv) 4-Laning from Kaliabor Tinali to Dolabari section from Km 0.0 to Km 17.3 of NH 37-A including construction of new Brahmaputra bridge. (v) 4-Lane highway connecting km 17.3 of NH 37A and km 182 of NH 52 between Dolabari and Jamuguri on EPC basis. (vi) Construction of Jia Bharali Bridge (1.2Km) along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A (New NH-715). (vii) Construction of Service road and RCC drain of from Kaliabor-Tinali (0.000) to Kolong Bridge (0+600) on EPC mode on NH-37 A(4th call) | Assam | 17-02-2026 | View Details | ||
| 67 | Independent Engineer Services for “Development, maintenance, management and operation of Greenfield High-Speed Corridor of 166.80 km (NH-6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam on Hybrid Annuity Mode” | Meghalaya | 16-02-2026 | 16-03-2026 | View Details | |
| 68 | One Time Improvement (OTI) of existing road from km 125+750 to km 130+960 falling in Manja Town of NH-29 in the State of Assam in FY 2025-26 | Assam | 16-02-2026 | View Details | ||
| 69 | Repair and Maintenance of the road stretch from Km 521.00 to Km 550.15 from Oyan to Pasighat, NH-515 (Total length = 29.15 Km) (Pkg-II & III) in the state of Arunachal Pradesh |
Arunachal Pradesh | 14-02-2026 | View Details | ||
| 70 | Short-term and permanent rectification works of damaged stretches, as per the recommendations of IIT Bombay, along with the balance works of the project, namely “Rehabilitation & Up-gradation of section from Km 242.00 to Km 298.00 of NH-4 in the UT of Andaman & Nicobar Islands (Package-II)”, to be executed at the Risk & Cost of the existing EPC Contractor on Percentage Rate basis during FY 2025–26. | Andaman and Nicobar | 12-02-2026 | View Details |