| 21 |
Restoration & Repairs by way of clearance of landslide, surface boulders, side drain, construction of pipe culverts, R/walls, B/walls ,RCC drain and laying of bituminous carpeting incl. Installing of Road safety Item Metallic Crash Barrier, Retroreflective Sign Board, Road marking, Delineators & Road studs from existing Km. 97.000 to Km. 123.500 on Dulhasti - Kishtwar- Bandarkoot-Kurya existing section of NH-244 in the UT of Jammu & Kashmir for FY 2025 -2026 through Performance Based Maintenance Contract (PBMC)
|
Union Territory of Jammu and Kashmir |
22-10-2025 |
|
|
View Details |
| 22 |
Expression of Interest (EOI) for Empanelment of Bridge Experts in NHIDCL
|
Delhi |
15-10-2025 |
|
|
View Details |
| 23 |
Supply of manpower (skilled) & equipments for FWD survey in total 38.80Km NH sections (from Bamuncherra to Srirampur on NH-208 and in Pkg-1't & Pkg-3'd of Agartala-Khowai section on NH-1088) to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 & NH-1088 in the state of Tripura in the FY 2025-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 24 |
Suppty of manpower (skilted) & equipments for FWD survey in total 26.VOKn NH sections (from Kumarghat to Futtali) to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 in the state of Tripura in the FY 2A25-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 25 |
Suppty of manpower {skilted} & equipments for BT core cutting and excavation of testing pits in total 100km NH projects to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 & NH-1088 in the state of Tripura in the FY 2025-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 26 |
Supply of manpower (skilted) & equipments for FWD survey in total 34.50Km Nl'l sections (from Fultali to Bamuncherra) to facilitate the CRRI-CSIR for undertaking of pavement evaluation study for various projects of NHIDCL on NH-208 in the state of Tripura in the FY 2025-26
|
Tripura |
14-10-2025 |
|
|
View Details |
| 27 |
CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF (I) "WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PAVED SHOULDER FROM LAVAMORE TO START OF PEDONG BYPASS ALONG NH-717A FROM KM 61.100 TO KM 79.700 IN THE STATE OF WEST BENGAL ON EPC MODE & (II) WIDENING AND UP-GRADATION OF EXISTING CARRIAGEWAY INTO 2-LANE WITH PS CONFIGURATION FROM RESHI TO RHENOCK FROM CH. 96.254 TO CH. 101.554 ALONG NH- 717A IN THE STATE OF SIKKIM ON EPC MODE
|
Sikkim |
13-10-2025 |
21-10-2025 |
|
View Details |
| 28 |
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF CONSTRUCTION AND UPGRADATION OF EXISTING ROAD ON NH-510 BETTWEEN RABANGLA TO GYALSHING TO 2-LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF SIKKIM UNDER SARDP-NE PHASE ‘A’ ON EPC MODE: (1) KM 32.500 TO KM 33.600 (PACKAGE-III) (2) KM 33.600 TO KM 58.840 (PACKAGE-IV) (3) KM 58.840 TO KM 75.00 (PACKAGE-V) (4) KM 75.000 TO KM 90.210 (PACKAGE-VI)
|
Sikkim |
13-10-2025 |
21-10-2025 |
|
View Details |
| 29 |
Repair, Maintenance and Improvement of riding quality of the selected sections of Jorhat-Jhanji on NH37(Old) in the State of Assam in FY:25-26
|
Assam |
11-10-2025 |
|
|
View Details |
| 30 |
Short term maintenance contract of NH-08 between ch.343+000 to ch.397+000 (road maintenance work between ch.375+000 to ch.397+000, i.e. total 13.5km in different stretches & road safety work in total 54 km i.e., from Ch. 343+000 to Ch. 397+000 in non DLP stretches) in the State of Tripura in the year 2025-26 on percentage basis and work order basis
|
Tripura |
10-10-2025 |
|
|
View Details |