| 51 |
STRENGTHENING OF MAO TO SENAPATI SECTION OF OLD NH-39 (NEW NH-02) FROM EXISTING CHAINAGE KM 212+328 (MAO GATE) TO KM 264+313 (TAPHOU KUKI) IN THE STATE OF MANIPUR ON EPC MODE (TOTAL LENGTH 51.985 KM)
|
Manipur |
18-05-2026 |
18-05-2026 |
|
View Details |
| 52 |
Hill Side Slope protection work at Kameda (386+550) in the work of "Construction & Upgradation of existing road to 2-lane with paved shoulder from Km 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km 379.100 to Km 380.275) of NH-07 in the State of Uttarakhand" under Risk & Cost of the EPC contractor.
|
Uttarakhand |
15-05-2026 |
|
|
View Details |
| 53 |
Short Term Maintenance Contract (STMC) for Maintenance & Repair of 2- Lane with hard shoulder of Changtongya-Longleng Road from Km 18+779 to Km 31+779 (Pkg-2) of NH-702 in the state of Nagaland for FY: 2026-27 (Percentage Rate and work Order Basis).
|
Nagaland |
15-05-2026 |
|
|
View Details |
| 54 |
BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM)
|
Manipur |
15-05-2026 |
15-05-2026 |
|
View Details |
| 55 |
Slope protection and landslide mitigation on NH-717A near Reshi border on EPC mode in the State of West Bengal during the FY 2026-2027
|
West Bengal |
14-05-2026 |
14-05-2026 |
|
View Details |
| 56 |
Performance based Maintenance Contract (PBMC) work for the Rhenock - Rorathang - Pakyong section of National Highway 717A (Ch. 0+000 to Ch. 26+706) in the state of Sikkim.
|
Sikkim |
11-05-2026 |
11-05-2026 |
|
View Details |
| 57 |
Short Term Maintenance Contract for Restoration and Repair of Longleng-Yongmong Road from Km. 33.248 to Km. 52.780 Km [Length=19.532 Km] in the State of Nagaland in the FY – 2026-27 - (Percentage Rate and Work Order Basis)
|
Nagaland |
06-05-2026 |
|
|
View Details |
| 58 |
Hill Side Slope protection work at Kameda (386+550) in the work of "Construction & Upgradation of existing road to 2-lane with paved shoulder from Km 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km 379.100 to Km 380.275) of NH-07 in the State of Uttarakhand" under Risk & Cost of the EPC contractor.
|
Uttarakhand |
30-04-2026 |
30-04-2026 |
|
View Details |
| 59 |
Consultancy services for preparation of Detailed Project Report and Pre-construction activities for Melli to Singtam section of NH-210 in the state of Sikkim
|
Sikkim |
27-04-2026 |
27-04-2026 |
|
View Details |
| 60 |
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of “Construction of 2-lane specification road with paved shoulder including Tunnel (300 m) at Rabongla on NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package-III (Design Chainage from KM 32.500 to Km 33.600) under SARDP-NE Phase- ‘A’ on the EPC basis in the State of Sikkim”, under jurisdiction of PMU-Gyalshing, NHIDCL on Percentage Rate Contract Basis in the state of Sikkim- 3rd Call
|
Sikkim |
27-04-2026 |
|
|
View Details |